IAC Assessment: TN0317
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1987
Principal Product PLASTIC COATED AUTO PART
NAICS n/a
SIC 3479 - Metal Coating And Allied Services
Sales $1,000,000-$5,000,000
# of Employees 76
Plant Area (Sq.Ft.) 0
Annual Production 60,000,000 Pieces
Production Hrs. Annual 6,240
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $98,981 1,689,332 kWh $0.06
Natural Gas $101,917 24,770 MMBtu $4.11
TOTAL ENERGY COSTS $200,898
RECOMMENDED SAVINGS* $20,629 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $16,955
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$4,727
Cost:
$1,002
- - $4,727 1,153 -
-
kWh
$4,727
1,153
MMBtu
02: 2.2531 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR Savings:
$3,674
Cost:
$1,722
- - $3,674 896 -
-
kWh
$3,674
896
MMBtu
03: 2.2425 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER Savings:
$3,428
Cost:
$8,100
- - $3,428 836 -
-
kWh
$3,428
836
MMBtu
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,677
Cost:
$800
- - $1,677 409 -
-
kWh
$1,677
409
MMBtu
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,340
Cost:
$75
$4,340 73,564 - - $4,340
73,564
kWh
-
-
MMBtu
06: 2.2163 USE MINIMUM STEAM OPERATING PRESSURE Savings:
$910
Cost:
-
- - $910 222 -
-
kWh
$910
222
MMBtu
07: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$1,816
Cost:
-
$1,816 30,774 - - $1,816
30,774
kWh
-
-
MMBtu
08: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$57
Cost:
$32
- - $57 14 -
-
kWh
$57
14
MMBtu
TOTAL RECOMMENDED Savings:
$20,629
Cost:
$11,731
$6,156 104,338 $14,473 3,530 $6,156
104,338
kWh
$14,473
3,530
MMBtu
TOTAL IMPLEMENTED Savings:
$16,955
Cost:
$10,009
$6,156 104,338 $10,799 2,634 $6,156
104,338
kWh
$10,799
2,634
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas