IAC Assessment: TN0333
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0333
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1988
Principal Product FELT-TIP MARKERS ETC.
NAICS n/a
SIC 3951 - Pens And Mechanical Pencils
Sales $10,000,000-$50,000,000
# of Employees 265
Plant Area (Sq.Ft.) 0
Annual Production 120,000 Pieces
Production Hrs. Annual 6,240
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $307,819 6,232,122 kWh $0.05
Natural Gas $5,395 830 MMBtu $6.50
Fuel Oil #2 $49,780 13,490 MMBtu $3.69
TOTAL ENERGY COSTS $362,994
RECOMMENDED SAVINGS* $45,903 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $44,783
#|Description Savings
Cost
Status Electricity Usage Fuel Oil #2 Administrative Changes Electricity Usage Fuel Oil #2 Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$10,014
Cost:
$3,720
- - $10,014 2,696 - - -
-
kWh
$10,014
2,696
MMBtu
-
-
$
02: 2.7123 KEEP LAMPS AND REFLECTORS CLEAN Savings:
$15,171
Cost:
$53,969
$12,307 251,172 - - $2,864 - $12,307
251,172
kWh
-
-
MMBtu
$2,864
-
$
03: 2.6232 INSTALL SET-BACK TIMERS Savings:
$10,455
Cost:
-
$10,455 213,365 - - - - $10,455
213,365
kWh
-
-
MMBtu
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$8,042
Cost:
$180
$8,042 164,127 - - - - $8,042
164,127
kWh
-
-
MMBtu
-
-
$
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$903
Cost:
$750
- - $903 243 - - -
-
kWh
$903
243
MMBtu
-
-
$
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$150
Cost:
-
- - $550 148 $(-400) - -
-
kWh
$550
148
MMBtu
$(-400)
-
$
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,120
Cost:
$252
$1,120 22,860 - - - - $1,120
22,860
kWh
-
-
MMBtu
-
-
$
08: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$48
Cost:
$25
- - $48 13 - - -
-
kWh
$48
13
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$45,903
Cost:
$58,896
$31,924 651,524 $11,515 3,100 $2,464 - $31,924
651,524
kWh
$11,515
3,100
MMBtu
$2,464
-
$
TOTAL IMPLEMENTED Savings:
$44,783
Cost:
$58,644
$30,804 628,664 $11,515 3,100 $2,464 - $30,804
628,664
kWh
$11,515
3,100
MMBtu
$2,464
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Fuel Oil #2 Administrative Changes Electricity Usage Fuel Oil #2 Administrative Changes