Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Tennessee |
---|---|
Assessment Year | 1988 |
Principal Product | FELT-TIP MARKERS ETC. |
NAICS | n/a |
SIC | 3951 - Pens And Mechanical Pencils |
Sales | $10,000,000-$50,000,000 |
# of Employees | 265 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 120,000 Pieces |
Production Hrs. Annual | 6,240 |
Location (State) | TN |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $307,819 | 6,232,122 | kWh | $0.05 |
Natural Gas | $5,395 | 830 | MMBtu | $6.50 |
Fuel Oil #2 | $49,780 | 13,490 | MMBtu | $3.69 |
TOTAL ENERGY COSTS | $362,994 | |||
RECOMMENDED SAVINGS* | $45,903 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $44,783 |
#|Description |
Savings Cost |
Status | Electricity Usage | Fuel Oil #2 | Administrative Changes | Electricity Usage | Fuel Oil #2 | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $10,014 Cost: $3,720 |
- | - | $10,014 | 2,696 | - | - |
- - kWh |
$10,014 2,696 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7123 KEEP LAMPS AND REFLECTORS CLEAN |
Savings: $15,171 Cost: $53,969 |
$12,307 | 251,172 | - | - | $2,864 | - |
$12,307 251,172 kWh |
- - MMBtu |
$2,864 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.6232 INSTALL SET-BACK TIMERS |
Savings: $10,455 Cost: - |
$10,455 | 213,365 | - | - | - | - |
$10,455 213,365 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $8,042 Cost: $180 |
$8,042 | 164,127 | - | - | - | - |
$8,042 164,127 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $903 Cost: $750 |
- | - | $903 | 243 | - | - |
- - kWh |
$903 243 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $150 Cost: - |
- | - | $550 | 148 | $(-400) | - |
- - kWh |
$550 148 MMBtu |
$(-400) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $1,120 Cost: $252 |
$1,120 | 22,860 | - | - | - | - |
$1,120 22,860 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES |
Savings: $48 Cost: $25 |
- | - | $48 | 13 | - | - |
- - kWh |
$48 13 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $45,903 Cost: $58,896 |
$31,924 | 651,524 | $11,515 | 3,100 | $2,464 | - | $31,924 651,524 kWh |
$11,515 3,100 MMBtu |
$2,464 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $44,783 Cost: $58,644 |
$30,804 | 628,664 | $11,515 | 3,100 | $2,464 | - | $30,804 628,664 kWh |
$11,515 3,100 MMBtu |
$2,464 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||