IAC logo
IAC Assessment: TN0342
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0342
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1988
Principal Product BAKERY PRODUCTS
NAICS n/a
SIC 2051 - Bread, Cake, And Related Products
Sales $5,000,000-$10,000,000
# of Employees 200
Plant Area (Sq.Ft.) 0
Annual Production 36,000,000 Pounds
Production Hrs. Annual 7,488
Location (State) SC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $198,178 3,977,140 kWh $0.05
Natural Gas $283,290 44,941 MMBtu $6.30
TOTAL ENERGY COSTS $481,468
RECOMMENDED SAVINGS* $18,594 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $14,510
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$4,366
Cost:
$767
- - $4,366 693 - - -
-
kWh
$4,366
693
MMBtu
-
-
$
02: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$2,999
Cost:
$400
- - $2,999 476 - - -
-
kWh
$2,999
476
MMBtu
-
-
$
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,301
Cost:
-
- - $1,701 270 $(-400) - -
-
kWh
$1,701
270
MMBtu
$(-400)
-
$
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,915
Cost:
$2,882
$1,915 89,097 - - - - $1,915
89,097
kWh
-
-
MMBtu
-
-
$
05: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$1,726
Cost:
$290
- - $1,726 274 - - -
-
kWh
$1,726
274
MMBtu
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,169
Cost:
-
$2,169 43,376 - - - - $2,169
43,376
kWh
-
-
MMBtu
-
-
$
07: 2.6232 INSTALL SET-BACK TIMERS Savings:
$2,096
Cost:
-
$2,096 41,911 - - - - $2,096
41,911
kWh
-
-
MMBtu
-
-
$
08: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$1,084
Cost:
$450
$1,084 21,688 - - - - $1,084
21,688
kWh
-
-
MMBtu
-
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$938
Cost:
$540
$938 18,757 - - - - $938
18,757
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$18,594
Cost:
$5,329
$8,202 214,829 $10,792 1,713 $(-400) - $8,202
214,829
kWh
$10,792
1,713
MMBtu
$(-400)
-
$
TOTAL IMPLEMENTED Savings:
$14,510
Cost:
$2,447
$4,118 82,356 $10,792 1,713 $(-400) - $4,118
82,356
kWh
$10,792
1,713
MMBtu
$(-400)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes