IAC logo
IAC Assessment: TN0344
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0344
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1988
Principal Product HEAVY METAL PRODUCTS
NAICS n/a
SIC 3483 - Ammunition, Exc. For Small Arms, Nec
Sales $50,000,000-$100,000,000
# of Employees 207
Plant Area (Sq.Ft.) 0
Annual Production 0 Units
Production Hrs. Annual 4,100
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $813,393 16,212,779 kWh $0.05
LPG $25,000 3,664 MMBtu $6.82
TOTAL ENERGY COSTS $838,393
RECOMMENDED SAVINGS* $73,195 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $21,459
#|Description Savings
Cost
Status Electricity Usage Electricity Usage
$ kWh
01: 2.2531 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR Savings:
$36,635
Cost:
-
$36,635 732,708 $36,635
732,708
kWh
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$18,098
Cost:
$1,850
$18,098 361,958 $18,098
361,958
kWh
03: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$7,913
Cost:
$5,000
$7,913 158,265 $7,913
158,265
kWh
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,521
Cost:
$1,313
$2,521 50,410 $2,521
50,410
kWh
05: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$982
Cost:
-
$982 19,637 $982
19,637
kWh
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$840
Cost:
$1,200
$840 16,999 $840
16,999
kWh
07: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$6,206
Cost:
$6,400
$6,206 - $6,206
-
kWh
TOTAL RECOMMENDED Savings:
$73,195
Cost:
$15,763
$73,195 1,339,977 $73,195
1,339,977
kWh
TOTAL IMPLEMENTED Savings:
$21,459
Cost:
$4,363
$21,459 429,367 $21,459
429,367
kWh
Savings
Cost
$ kWh
Electricity Usage Electricity Usage