Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Tennessee |
---|---|
Assessment Year | 1989 |
Principal Product | SNACK FOODS |
NAICS | n/a |
SIC | 2052 - Cookies And Crackers |
Sales | $50,000,000-$100,000,000 |
# of Employees | 348 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 41,000,000 Pounds |
Production Hrs. Annual | 6,240 |
Location (State) | TN |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $247,302 | 5,131,888 | kWh | $0.05 |
Natural Gas | $115,944 | 36,116 | MMBtu | $3.21 |
TOTAL ENERGY COSTS | $363,246 | |||
RECOMMENDED SAVINGS* | $38,289 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $29,824 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Administrative Changes | Electricity Usage | Natural Gas | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1212 OPERATE BOILERS ON HIGH FIRE SETTING |
Savings: $11,558 Cost: $20,160 |
- | - | $11,558 | 3,612 | - | - |
- - kWh |
$11,558 3,612 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7231 USE RADIANT HEATER FOR SPOT HEATING |
Savings: $7,050 Cost: $11,350 |
- | - | $7,050 | 2,303 | - | - |
- - kWh |
$7,050 2,303 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7123 KEEP LAMPS AND REFLECTORS CLEAN |
Savings: $8,465 Cost: $12,145 |
$7,990 | 166,471 | - | - | $475 | - |
$7,990 166,471 kWh |
- - MMBtu |
$475 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $4,164 Cost: $180 |
$4,164 | 86,753 | - | - | - | - |
$4,164 86,753 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $46 Cost: - |
- | - | $346 | 108 | $(-300) | - |
- - kWh |
$346 108 MMBtu |
$(-300) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $5,599 Cost: $1,800 |
$5,599 | 116,647 | - | - | - | - |
$5,599 116,647 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,407 Cost: $540 |
$1,407 | 29,308 | - | - | - | - |
$1,407 29,308 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $38,289 Cost: $46,175 |
$19,160 | 399,179 | $18,954 | 6,023 | $175 | - | $19,160 399,179 kWh |
$18,954 6,023 MMBtu |
$175 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $29,824 Cost: $34,030 |
$11,170 | 232,708 | $18,954 | 6,023 | $(-300) | - | $11,170 232,708 kWh |
$18,954 6,023 MMBtu |
$(-300) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Administrative Changes | Electricity Usage | Natural Gas | Administrative Changes |