IAC logo
IAC Assessment: TN0375
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0375
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1989
Principal Product WOMEN'S SPORTSWEAR
NAICS n/a
SIC 2339 - Women's, Misses', and Juniors' Outerwear, Not Elsewhere Classified
Sales $10,000,000-$50,000,000
# of Employees 320
Plant Area (Sq.Ft.) 0
Annual Production 2,300,000 Pieces
Production Hrs. Annual 4,320
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $146,001 2,731,536 kWh $0.05
Natural Gas $35,284 7,708 MMBtu $4.58
TOTAL ENERGY COSTS $181,285
RECOMMENDED SAVINGS* $11,885 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$1,826
Cost:
$622
- - $1,826 397 - - -
-
kWh
$1,826
397
MMBtu
-
-
$
02: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$1,822
Cost:
$360
- - $1,822 396 - - -
-
kWh
$1,822
396
MMBtu
-
-
$
03: 2.7123 KEEP LAMPS AND REFLECTORS CLEAN Savings:
$4,940
Cost:
$11,550
$4,836 91,149 - - $104 - $4,836
91,149
kWh
-
-
MMBtu
$104
-
$
04: 2.2163 USE MINIMUM STEAM OPERATING PRESSURE Savings:
$511
Cost:
-
- - $511 111 - - -
-
kWh
$511
111
MMBtu
-
-
$
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$474
Cost:
$442
- - $474 103 - - -
-
kWh
$474
103
MMBtu
-
-
$
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$354
Cost:
$300
- - $354 77 - - -
-
kWh
$354
77
MMBtu
-
-
$
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,387
Cost:
-
$1,387 17,878 - - - - $1,387
17,878
kWh
-
-
MMBtu
-
-
$
08: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$166
Cost:
$60
- - $166 36 - - -
-
kWh
$166
36
MMBtu
-
-
$
09: 2.2531 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR Savings:
$79
Cost:
-
- - $79 17 - - -
-
kWh
$79
17
MMBtu
-
-
$
10: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$326
Cost:
$84
$326 6,155 - - - - $326
6,155
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$11,885
Cost:
$13,418
$6,549 115,182 $5,232 1,137 $104 - $6,549
115,182
kWh
$5,232
1,137
MMBtu
$104
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes