Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Tennessee |
---|---|
Assessment Year | 1989 |
Principal Product | COPPER CLAD LAMINATES |
NAICS | n/a |
SIC | 3083 - Laminated Plastics Plate & Sheet |
Sales | $50,000,000-$100,000,000 |
# of Employees | 185 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 30,000 Thousand Feet |
Production Hrs. Annual | 8,736 |
Location (State) | SC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $801,737 | 18,230,071 | kWh | $0.04 |
Natural Gas | $765,836 | 228,661 | MMBtu | $3.35 |
TOTAL ENERGY COSTS | $1,567,573 | |||
RECOMMENDED SAVINGS* | $99,905 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $89,885 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Electricity Usage | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7141 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS |
Savings: $67,651 Cost: $61,200 |
$67,651 | 1,537,515 | - | - |
$67,651 1,537,515 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS |
Savings: $4,181 Cost: $75 |
- | - | $4,181 | 1,267 |
- - kWh |
$4,181 1,267 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $9,143 Cost: $6,750 |
$9,143 | 207,796 | - | - |
$9,143 207,796 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $8,910 Cost: $420 |
$8,910 | 202,521 | - | - |
$8,910 202,521 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.6232 INSTALL SET-BACK TIMERS |
Savings: $6,151 Cost: $6,350 |
$6,151 | 139,801 | - | - |
$6,151 139,801 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $3,869 Cost: $440 |
$3,869 | 87,925 | - | - |
$3,869 87,925 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $99,905 Cost: $75,235 |
$95,724 | 2,175,558 | $4,181 | 1,267 | $95,724 2,175,558 kWh |
$4,181 1,267 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $89,885 Cost: $68,445 |
$85,704 | 1,947,832 | $4,181 | 1,267 | $85,704 1,947,832 kWh |
$4,181 1,267 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Electricity Usage | Natural Gas |