IAC Assessment: TN0381
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0381
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1989
Principal Product ELECTRIC MOTORS
NAICS n/a
SIC 3621 - Motors And Generators
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 0
Annual Production 13,000,000 Pieces
Production Hrs. Annual 7,488
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $142,354 2,388,335 kWh $0.06
Fuel Oil #2 $11,000 2,660 MMBtu $4.14
TOTAL ENERGY COSTS $153,354
RECOMMENDED SAVINGS* $46,869 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,768
#|Description Savings
Cost
Status Electricity Usage Administrative Changes Electricity Usage Administrative Changes
$ kWh $ $
01: 2.7123 KEEP LAMPS AND REFLECTORS CLEAN Savings:
$21,317
Cost:
$21,317
$20,856 347,597 $461 - $20,856
347,597
kWh
$461
-
$
02: 2.7133 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE Savings:
$16,038
Cost:
$16,040
$16,038 267,292 - - $16,038
267,292
kWh
-
-
$
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,515
Cost:
$1,800
$2,515 41,911 - - $2,515
41,911
kWh
-
-
$
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,726
Cost:
$262
$2,726 45,428 - - $2,726
45,428
kWh
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,846
Cost:
$120
$1,846 30,774 - - $1,846
30,774
kWh
-
-
$
06: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$1,020
Cost:
$4,820
$1,020 16,999 - - $1,020
16,999
kWh
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$739
Cost:
$528
$739 12,309 - - $739
12,309
kWh
-
-
$
08: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$668
Cost:
$300
$668 11,137 - - $668
11,137
kWh
-
-
$
TOTAL RECOMMENDED Savings:
$46,869
Cost:
$45,187
$46,408 773,447 $461 - $46,408
773,447
kWh
$461
-
$
TOTAL IMPLEMENTED Savings:
$5,768
Cost:
$2,748
$5,768 96,131 - - $5,768
96,131
kWh
-
-
$
Savings
Cost
$ kWh $ $
Electricity Usage Administrative Changes Electricity Usage Administrative Changes