IAC logo
IAC Assessment: TN0382
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0382
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1989
Principal Product MILITARY TYPE FURNITURE
NAICS n/a
SIC 2531 - Public Building & Related Furniture
Sales $1,000,000-$5,000,000
# of Employees 90
Plant Area (Sq.Ft.) 0
Annual Production 12,000 Pieces
Production Hrs. Annual 2,210
Location (State) VA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $75,642 1,131,887 kWh $0.07
Fuel Oil #2 $26,078 5,922 MMBtu $4.40
TOTAL ENERGY COSTS $101,720
RECOMMENDED SAVINGS* $8,329 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,562
#|Description Savings
Cost
Status Electricity Usage Fuel Oil #2 Electricity Usage Fuel Oil #2
$ kWh $ MMBtu
01: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$2,396
Cost:
$600
$2,396 35,756 - - $2,396
35,756
kWh
-
-
MMBtu
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,767
Cost:
$300
$1,767 26,377 - - $1,767
26,377
kWh
-
-
MMBtu
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$394
Cost:
$1,154
- - $394 89 -
-
kWh
$394
89
MMBtu
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,354
Cost:
-
$1,354 20,223 - - $1,354
20,223
kWh
-
-
MMBtu
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$438
Cost:
$1,850
$255 3,810 $183 41 $255
3,810
kWh
$183
41
MMBtu
06: 2.6232 INSTALL SET-BACK TIMERS Savings:
$707
Cost:
-
$707 10,551 - - $707
10,551
kWh
-
-
MMBtu
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$530
Cost:
$1,250
$530 7,913 - - $530
7,913
kWh
-
-
MMBtu
08: 2.2531 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR Savings:
$115
Cost:
$600
- - $115 26 -
-
kWh
$115
26
MMBtu
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$354
Cost:
$900
$354 10,551 - - $354
10,551
kWh
-
-
MMBtu
10: 2.7122 DISCONNECT BALLASTS Savings:
$137
Cost:
$221
$137 2,052 - - $137
2,052
kWh
-
-
MMBtu
11: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$137
Cost:
$490
$137 2,052 - - $137
2,052
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$8,329
Cost:
$7,365
$7,637 119,285 $692 156 $7,637
119,285
kWh
$692
156
MMBtu
TOTAL IMPLEMENTED Savings:
$6,562
Cost:
$7,065
$5,870 92,908 $692 156 $5,870
92,908
kWh
$692
156
MMBtu
Savings