Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Tennessee |
---|---|
Assessment Year | 1989 |
Principal Product | REFUSE COLLECTION BODIES |
NAICS | n/a |
SIC | 3713 - Truck And Bus Bodies |
Sales | $5,000,000-$10,000,000 |
# of Employees | 88 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 540 Pieces |
Production Hrs. Annual | 4,335 |
Location (State) | VA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $55,071 | 1,072,978 | kWh | $0.05 |
Fuel Oil #2 | $20,743 | 5,460 | MMBtu | $3.80 |
Other Energy | $1,221 | 183 | MMBtu | $6.67 |
TOTAL ENERGY COSTS | $77,035 | |||
RECOMMENDED SAVINGS* | $10,126 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $8,922 |
#|Description |
Savings Cost |
Status | Electricity Usage | Fuel Oil #2 | Other Energy | Electricity Usage | Fuel Oil #2 | Other Energy | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $5,046 Cost: - |
$594 | 11,430 | $4,452 | 1,176 | - | - |
$594 11,430 kWh |
$4,452 1,176 MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.6124 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE |
Savings: $1,484 Cost: $3,200 |
- | - | $1,484 | 392 | - | - |
- - kWh |
$1,484 392 MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS |
Savings: $1,204 Cost: $4,800 |
- | - | $1,204 | 318 | - | - |
- - kWh |
$1,204 318 MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $991 Cost: - |
$991 | 19,050 | - | - | - | - |
$991 19,050 kWh |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $777 Cost: $270 |
$777 | 14,947 | - | - | - | - |
$777 14,947 kWh |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4312 IMPROVE LUBRICATION PRACTICES |
Savings: $274 Cost: - |
$274 | 5,275 | - | - | - | - |
$274 5,275 kWh |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.6125 KEEP EQUIPMENT CLEAN |
Savings: $121 Cost: $450 |
- | - | - | - | $121 | 18 |
- - kWh |
- - MMBtu |
$121 18 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $229 Cost: $261 |
$229 | 4,396 | - | - | - | - |
$229 4,396 kWh |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $10,126 Cost: $8,981 |
$2,865 | 55,098 | $7,140 | 1,886 | $121 | 18 | $2,865 55,098 kWh |
$7,140 1,886 MMBtu |
$121 18 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $8,922 Cost: $4,181 |
$2,865 | 55,098 | $5,936 | 1,568 | $121 | 18 | $2,865 55,098 kWh |
$5,936 1,568 MMBtu |
$121 18 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Fuel Oil #2 | Other Energy | Electricity Usage | Fuel Oil #2 | Other Energy |