IAC Assessment: TN0388
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0388
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1990
Principal Product LEAD WHEEL WEIGHTS
NAICS n/a
SIC 3499 - Fabricated Metal Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 54
Plant Area (Sq.Ft.) 0
Annual Production 18,000,000 Pounds
Production Hrs. Annual 5,106
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $253,754 3,656,800 kWh $0.07
Fuel Oil #2 $14,762 3,500 MMBtu $4.22
TOTAL ENERGY COSTS $268,516
RECOMMENDED SAVINGS* $47,963 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $16,616
#|Description Savings
Cost
Status Electricity Usage Fuel Oil #2 Administrative Changes Electricity Usage Fuel Oil #2 Administrative Changes
$ kWh $ MMBtu $ $
01: 2.2511 INSULATE BARE EQUIPMENT Savings:
$13,078
Cost:
$3,272
$13,078 189,625 - - - - $13,078
189,625
kWh
-
-
MMBtu
-
-
$
02: 2.2163 USE MINIMUM STEAM OPERATING PRESSURE Savings:
$1,676
Cost:
-
- - $1,676 391 - - -
-
kWh
$1,676
391
MMBtu
-
-
$
03: 2.7123 KEEP LAMPS AND REFLECTORS CLEAN Savings:
$6,691
Cost:
$15,675
$6,309 91,442 - - $382 - $6,309
91,442
kWh
-
-
MMBtu
$382
-
$
04: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$21,618
Cost:
$7,350
$21,618 313,306 - - - - $21,618
313,306
kWh
-
-
MMBtu
-
-
$
05: 2.2153 CLOSE OFF UNNEEDED STEAM LINES Savings:
$403
Cost:
-
- - $403 94 - - -
-
kWh
$403
94
MMBtu
-
-
$
06: 2.6232 INSTALL SET-BACK TIMERS Savings:
$1,598
Cost:
-
$1,598 23,154 - - - - $1,598
23,154
kWh
-
-
MMBtu
-
-
$
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,257
Cost:
$490
$1,257 18,171 - - - - $1,257
18,171
kWh
-
-
MMBtu
-
-
$
08: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$1,005
Cost:
$450
$1,005 14,654 - - - - $1,005
14,654
kWh
-
-
MMBtu
-
-
$
09: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$90
Cost:
$200
- - $90 21 - - -
-
kWh
$90
21
MMBtu
-
-
$
10: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$283
Cost:
$1,000
$283 4,103 - - - - $283
4,103
kWh
-
-
MMBtu
-
-
$
11: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$264
Cost:
$120
$264 3,810 - - - - $264
3,810
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$47,963
Cost:
$28,557
$45,412 658,265 $2,169 506 $382 - $45,412
658,265
kWh
$2,169
506
MMBtu
$382
-
$
TOTAL IMPLEMENTED Savings:
$16,616
Cost:
$3,392
$14,940 216,589 $1,676 391 - - $14,940
216,589
kWh
$1,676
391
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Fuel Oil #2 Administrative Changes Electricity Usage Fuel Oil #2 Administrative Changes