Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Tennessee |
---|---|
Assessment Year | 1990 |
Principal Product | SOFT DRINK BOTTLES |
NAICS | n/a |
SIC | 3085 - Plastics Bottles |
Sales | $100,000,000-$500,000,000 |
# of Employees | 235 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 100,000 Pounds |
Production Hrs. Annual | 8,736 |
Location (State) | NC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $2,740,348 | 54,326,496 | kWh | $0.05 |
Natural Gas | $14,205 | 2,748 | MMBtu | $5.17 |
TOTAL ENERGY COSTS | $2,754,553 | |||
RECOMMENDED SAVINGS* | $294,345 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $294,345 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Administrative Changes | Electricity Usage | Natural Gas | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4312 IMPROVE LUBRICATION PRACTICES |
Savings: $44,021 Cost: $13,500 |
$44,021 | 880,422 | - | - | - | - |
$44,021 880,422 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $39,625 Cost: $5,440 |
$39,625 | 792,497 | - | - | - | - |
$39,625 792,497 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $11,893 Cost: $1,200 |
$6,272 | 125,440 | $5,621 | 1,081 | - | - |
$6,272 125,440 kWh |
$5,621 1,081 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $28,121 Cost: $12,250 |
$28,121 | 562,427 | - | - | - | - |
$28,121 562,427 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7123 KEEP LAMPS AND REFLECTORS CLEAN |
Savings: $1,983 Cost: $5,850 |
$1,407 | 28,136 | - | - | $576 | - |
$1,407 28,136 kWh |
- - MMBtu |
$576 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $703 Cost: $438 |
$703 | 14,068 | - | - | - | - |
$703 14,068 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $167,999 Cost: $976,000 |
$301,920 | 6,038,394 | $(-133,921) | (-25,754) | - | - |
$301,920 6,038,394 kWh |
$(-133,921) (-25,754) MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $294,345 Cost: $1,014,678 |
$422,069 | 8,441,384 | $(-128,300) | (-24,673) | $576 | - | $422,069 8,441,384 kWh |
$(-128,300) (-24,673) MMBtu |
$576 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $294,345 Cost: $1,014,678 |
$422,069 | 8,441,384 | $(-128,300) | (-24,673) | $576 | - | $422,069 8,441,384 kWh |
$(-128,300) (-24,673) MMBtu |
$576 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Administrative Changes | Electricity Usage | Natural Gas | Administrative Changes |