IAC logo
IAC Assessment: TN0400
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0400
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1990
Principal Product ALCOHOL PADS & IODINE
NAICS n/a
SIC 2844 - Toilet Preparations
Sales $5,000,000-$10,000,000
# of Employees 120
Plant Area (Sq.Ft.) 0
Annual Production 280,000 Pieces
Production Hrs. Annual 4,394
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $106,834 2,019,930 kWh $0.05
Natural Gas $27,615 5,670 MMBtu $4.87
TOTAL ENERGY COSTS $134,449
RECOMMENDED SAVINGS* $32,268 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,138
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$12,739
Cost:
$4,900
$8,481 254,689 $4,258 546 - - $8,481
254,689
kWh
$4,258
546
MMBtu
-
-
$
02: 2.6121 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED Savings:
$7,297
Cost:
$13,360
$2,377 44,842 $4,920 1,004 - - $2,377
44,842
kWh
$4,920
1,004
MMBtu
-
-
$
03: 2.7123 KEEP LAMPS AND REFLECTORS CLEAN Savings:
$8,711
Cost:
$23,808
$8,062 152,110 - - $649 - $8,062
152,110
kWh
-
-
MMBtu
$649
-
$
04: 2.6232 INSTALL SET-BACK TIMERS Savings:
$1,755
Cost:
$6,350
$1,755 33,118 - - - - $1,755
33,118
kWh
-
-
MMBtu
-
-
$
05: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$1,383
Cost:
-
$1,383 26,084 - - - - $1,383
26,084
kWh
-
-
MMBtu
-
-
$
06: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$103
Cost:
$180
- - $103 21 - - -
-
kWh
$103
21
MMBtu
-
-
$
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$280
Cost:
$361
$280 5,275 - - - - $280
5,275
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$32,268
Cost:
$48,959
$22,338 516,118 $9,281 1,571 $649 - $22,338
516,118
kWh
$9,281
1,571
MMBtu
$649
-
$
TOTAL IMPLEMENTED Savings:
$3,138
Cost:
$6,350
$3,138 59,202 - - - - $3,138
59,202
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes