Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1990
Principal Product MEN SUITS & SPORT COATS
NAICS n/a
SIC 2311 - Men's and Boys' Suits, Coats, and Overcoats
Sales $50,000,000-$100,000,000
# of Employees 925
Plant Area (Sq.Ft.) 0
Annual Production 700,000 Pieces
Production Hrs. Annual 3,995
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $155,234 3,143,904 kWh $0.05
Natural Gas $86,111 24,048 MMBtu $3.58
TOTAL ENERGY COSTS $241,345
RECOMMENDED SAVINGS* $21,860 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,896
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$2,941
Cost:
$500
- - $2,941 817 - - -
-
kWh
$2,941
817
MMBtu
-
-
$
02: 2.7123 KEEP LAMPS AND REFLECTORS CLEAN Savings:
$11,964
Cost:
-
$11,044 225,381 - - $920 - $11,044
225,381
kWh
-
-
MMBtu
$920
-
$
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$2,891
Cost:
$1,405
- - $2,891 803 - - -
-
kWh
$2,891
803
MMBtu
-
-
$
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,019
Cost:
$3,000
- - $1,019 283 - - -
-
kWh
$1,019
283
MMBtu
-
-
$
05: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$810
Cost:
-
- - $810 225 - - -
-
kWh
$810
225
MMBtu
-
-
$
06: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$641
Cost:
$200
- - $641 178 - - -
-
kWh
$641
178
MMBtu
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$862
Cost:
$480
$862 17,585 - - - - $862
17,585
kWh
-
-
MMBtu
-
-
$
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$732
Cost:
-
$732 14,947 - - - - $732
14,947
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$21,860
Cost:
$5,585
$12,638 257,913 $8,302 2,306 $920 - $12,638
257,913
kWh
$8,302
2,306
MMBtu
$920
-
$
TOTAL IMPLEMENTED Savings:
$9,896
Cost:
$5,585
$1,594 32,532 $8,302 2,306 - - $1,594
32,532
kWh
$8,302
2,306
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes