IAC logo
IAC Assessment: TN0429
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0429
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1991
Principal Product HYDRAULIC PRESSES
NAICS n/a
SIC 3559 - Special Industry Machinery, Nec
Sales $5,000,000-$10,000,000
# of Employees 74
Plant Area (Sq.Ft.) 0
Annual Production 200 Pieces
Production Hrs. Annual 2,230
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $35,981 408,265 kWh $0.09
Natural Gas $9,448 1,952 MMBtu $4.84
TOTAL ENERGY COSTS $45,429
RECOMMENDED SAVINGS* $8,428 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,428
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$2,097
Cost:
$700
$748 8,499 $1,349 281 $748
8,499
kWh
$1,349
281
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,895
Cost:
$12,140
$3,895 44,256 - - $3,895
44,256
kWh
-
-
MMBtu
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,186
Cost:
-
$1,186 13,482 - - $1,186
13,482
kWh
-
-
MMBtu
04: 2.6214 SHUT OFF PILOTS IN STANDBY EQUIPMENT Savings:
$192
Cost:
-
- - $192 40 -
-
kWh
$192
40
MMBtu
05: 2.6232 INSTALL SET-BACK TIMERS Savings:
$490
Cost:
-
$490 5,569 - - $490
5,569
kWh
-
-
MMBtu
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$181
Cost:
$40
$181 2,052 - - $181
2,052
kWh
-
-
MMBtu
07: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$181
Cost:
$300
$181 2,052 - - $181
2,052
kWh
-
-
MMBtu
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$103
Cost:
-
$103 1,172 - - $103
1,172
kWh
-
-
MMBtu
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$103
Cost:
$110
$103 1,172 - - $103
1,172
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$8,428
Cost:
$13,290
$6,887 78,254 $1,541 321 $6,887
78,254
kWh
$1,541
321
MMBtu
TOTAL IMPLEMENTED Savings:
$8,428
Cost:
$13,290
$6,887 78,254 $1,541 321 $6,887
78,254
kWh
$1,541
321
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas