Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Tennessee |
---|---|
Assessment Year | 1991 |
Principal Product | ELEC. ROTATING COMPONENT |
NAICS | n/a |
SIC | 3679 - Electronic Components, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 370 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 13,500 Pieces |
Production Hrs. Annual | 4,080 |
Location (State) | NC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $413,263 | 7,372,509 | kWh | $0.06 |
TOTAL ENERGY COSTS | $413,263 | |||
RECOMMENDED SAVINGS* | $86,742 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Administrative Changes | Electricity Usage | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $27,754 Cost: $8,700 |
$27,754 | 495,604 | - | - |
$27,754 495,604 kWh |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $23,175 Cost: $2,472 |
$23,175 | 413,834 | - | - |
$23,175 413,834 kWh |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7262 SEPARATE CONTROLS OF AIR HANDLERS FROM AC/ HEATING SYSTEMS |
Savings: $13,212 Cost: $7,325 |
$13,212 | 235,932 | - | - |
$13,212 235,932 kWh |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA |
Savings: $8,321 Cost: - |
$8,321 | 148,593 | - | - |
$8,321 148,593 kWh |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $2,938 Cost: $2,450 |
$2,938 | 52,462 | - | - |
$2,938 52,462 kWh |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.6232 INSTALL SET-BACK TIMERS |
Savings: $1,526 Cost: - |
$1,526 | 27,257 | - | - |
$1,526 27,257 kWh |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7227 USE WATER ON AIR CONDITIONING EXCHANGER TO IMPROVE HEAT TRANSFER AND INCREASE AIR CONDITIONER EFFICIENCY |
Savings: $1,477 Cost: - |
$1,477 | 26,377 | - | - |
$1,477 26,377 kWh |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,412 Cost: $620 |
$1,412 | 25,205 | - | - |
$1,412 25,205 kWh |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $1,462 Cost: - |
$1,379 | 24,619 | $83 | - |
$1,379 24,619 kWh |
$83 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.7212 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS |
Savings: $1,165 Cost: $799 |
$1,165 | 20,809 | - | - |
$1,165 20,809 kWh |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,034 Cost: $3,340 |
$1,034 | 18,464 | - | - |
$1,034 18,464 kWh |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,839 Cost: $3,550 |
$2,839 | 50,703 | - | - |
$2,839 50,703 kWh |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 2.7229 AIR CONDITION ONLY SPACE NECESSARY |
Savings: $427 Cost: $675 |
$427 | 7,620 | - | - |
$427 7,620 kWh |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $86,742 Cost: $29,931 |
$86,659 | 1,547,479 | $83 | - | $86,659 1,547,479 kWh |
$83 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - - kWh |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Administrative Changes | Electricity Usage | Administrative Changes |