IAC Assessment: TN0432
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0432
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1991
Principal Product UNFINISHED CABINET DOORS
NAICS n/a
SIC 2431 - Millwork
Sales $5,000,000-$10,000,000
# of Employees 115
Plant Area (Sq.Ft.) 0
Annual Production 750,000 Pieces
Production Hrs. Annual 4,875
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $283,193 4,868,992 kWh $0.06
Wood $11,930 882,360 MMBtu $0.01
TOTAL ENERGY COSTS $295,123
RECOMMENDED SAVINGS* $120,928 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Wood Electricity Usage Wood
$ kWh $ MMBtu
01: 2.3414 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT Savings:
$112,175
Cost:
$326,250
$115,175 1,207,503 $(-3,000) (-27,011) $115,175
1,207,503
kWh
$(-3,000)
(-27,011)
MMBtu
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$6,324
Cost:
$7,500
$6,324 109,027 - - $6,324
109,027
kWh
-
-
MMBtu
03: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$595
Cost:
$225
$595 10,258 - - $595
10,258
kWh
-
-
MMBtu
04: 2.6232 INSTALL SET-BACK TIMERS Savings:
$476
Cost:
-
$476 8,206 - - $476
8,206
kWh
-
-
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,358
Cost:
$1,564
$1,358 33,411 - - $1,358
33,411
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$120,928
Cost:
$335,539
$123,928 1,368,405 $(-3,000) (-27,011) $123,928
1,368,405
kWh
$(-3,000)
(-27,011)
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Wood Electricity Usage Wood