IAC logo
IAC Assessment: TN0439
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0439
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1991
Principal Product STEEL AEROSOL CANS
NAICS n/a
SIC 3411 - Metal Cans
Sales $50,000,000-$100,000,000
# of Employees 150
Plant Area (Sq.Ft.) 0
Annual Production 84,000,000 Pieces
Production Hrs. Annual 7,488
Location (State) SC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $283,726 5,892,439 kWh $0.05
Natural Gas $347,456 94,128 MMBtu $3.69
TOTAL ENERGY COSTS $631,182
RECOMMENDED SAVINGS* $28,253 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $28,253
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$13,583
Cost:
$12,800
- - $13,583 3,671 -
-
kWh
$13,583
3,671
MMBtu
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$5,413
Cost:
$1,020
- - $5,413 1,463 -
-
kWh
$5,413
1,463
MMBtu
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$4,685
Cost:
-
$4,685 97,597 - - $4,685
97,597
kWh
-
-
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,954
Cost:
$210
$2,954 61,547 - - $2,954
61,547
kWh
-
-
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,266
Cost:
$990
$1,266 26,671 - - $1,266
26,671
kWh
-
-
MMBtu
06: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$352
Cost:
-
$352 7,327 - - $352
7,327
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$28,253
Cost:
$15,020
$9,257 193,142 $18,996 5,134 $9,257
193,142
kWh
$18,996
5,134
MMBtu
TOTAL IMPLEMENTED Savings:
$28,253
Cost:
$15,020
$9,257 193,142 $18,996 5,134 $9,257
193,142
kWh
$18,996
5,134
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas