IAC Assessment: TN0446
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0446
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1991
Principal Product DENIM PANTS
NAICS n/a
SIC 2325 - Men's and Boys' Separate Trousers and Slacks
Sales $10,000,000-$50,000,000
# of Employees 170
Plant Area (Sq.Ft.) 0
Annual Production 4,800,000 Pieces
Production Hrs. Annual 2,880
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $54,870 815,358 kWh $0.07
LPG $17,394 1,858 MMBtu $9.36
TOTAL ENERGY COSTS $72,264
RECOMMENDED SAVINGS* $9,165 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,165
#|Description Savings
Cost
Status Electricity Usage LPG Administrative Changes Electricity Usage LPG Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$5,675
Cost:
$2,700
$5,675 84,701 - - - - $5,675
84,701
kWh
-
-
MMBtu
-
-
$
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,089
Cost:
$1,590
- - $1,089 116 - - -
-
kWh
$1,089
116
MMBtu
-
-
$
03: 2.6222 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS Savings:
$507
Cost:
-
- - $507 54 - - -
-
kWh
$507
54
MMBtu
-
-
$
04: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$488
Cost:
$165
- - $488 52 - - -
-
kWh
$488
52
MMBtu
-
-
$
05: 2.7123 KEEP LAMPS AND REFLECTORS CLEAN Savings:
$1,068
Cost:
-
$1,021 15,240 - - $47 - $1,021
15,240
kWh
-
-
MMBtu
$47
-
$
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$338
Cost:
$859
- - $338 36 - - -
-
kWh
$338
36
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$9,165
Cost:
$5,314
$6,696 99,941 $2,422 258 $47 - $6,696
99,941
kWh
$2,422
258
MMBtu
$47
-
$
TOTAL IMPLEMENTED Savings:
$9,165
Cost:
$5,314
$6,696 99,941 $2,422 258 $47 - $6,696
99,941
kWh
$2,422
258
MMBtu
$47
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage LPG Administrative Changes Electricity Usage LPG Administrative Changes