IAC logo
IAC Assessment: TN0457
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0457
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1992
Principal Product ALUMINUM ENGINE CASTINGS
NAICS n/a
SIC 3363 - Aluminum Die-castings
Sales $10,000,000-$50,000,000
# of Employees 340
Plant Area (Sq.Ft.) 0
Annual Production 15,200,000 Pounds
Production Hrs. Annual 6,000
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $948,566 18,284,877 kWh $0.05
Natural Gas $831,959 170,670 MMBtu $4.87
TOTAL ENERGY COSTS $1,780,525
RECOMMENDED SAVINGS* $32,230 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,886
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$11,989
Cost:
$368
- - $11,989 2,447 - - -
-
kWh
$11,989
2,447
MMBtu
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$15,393
Cost:
-
$15,393 296,014 - - - - $15,393
296,014
kWh
-
-
MMBtu
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,886
Cost:
$210
$3,886 74,736 - - - - $3,886
74,736
kWh
-
-
MMBtu
-
-
$
04: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$518
Cost:
$1,015
$518 9,965 - - - - $518
9,965
kWh
-
-
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$444
Cost:
-
$615 11,723 - - $(-171) - $615
11,723
kWh
-
-
MMBtu
$(-171)
-
$
TOTAL RECOMMENDED Savings:
$32,230
Cost:
$1,593
$20,412 392,438 $11,989 2,447 $(-171) - $20,412
392,438
kWh
$11,989
2,447
MMBtu
$(-171)
-
$
TOTAL IMPLEMENTED Savings:
$3,886
Cost:
$210
$3,886 74,736 - - - - $3,886
74,736
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes