IAC logo
IAC Assessment: TN0460
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0460
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1992
Principal Product PLASTIC EXTRUSIONS
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 55
Plant Area (Sq.Ft.) 0
Annual Production 4,000,000 Pounds
Production Hrs. Annual 6,816
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $66,898 1,252,638 kWh $0.05
Natural Gas $6,765 1,126 MMBtu $6.01
TOTAL ENERGY COSTS $73,663
RECOMMENDED SAVINGS* $12,412 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Administrative Changes Electricity Usage Administrative Changes
$ kWh $ $
01: 2.4237 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING Savings:
$3,417
Cost:
$3,460
$3,417 64,478 - - $3,417
64,478
kWh
-
-
$
02: 2.7123 KEEP LAMPS AND REFLECTORS CLEAN Savings:
$3,377
Cost:
$5,459
$2,730 51,583 $647 - $2,730
51,583
kWh
$647
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,460
Cost:
$30
$1,460 27,550 - - $1,460
27,550
kWh
-
-
$
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,181
Cost:
$540
$1,181 22,274 - - $1,181
22,274
kWh
-
-
$
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,258
Cost:
$880
$1,258 23,740 - - $1,258
23,740
kWh
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$606
Cost:
-
$606 11,430 - - $606
11,430
kWh
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$880
Cost:
$257
$1,493 28,136 $(-613) - $1,493
28,136
kWh
$(-613)
-
$
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$233
Cost:
$185
$233 4,396 - - $233
4,396
kWh
-
-
$
TOTAL RECOMMENDED Savings:
$12,412
Cost:
$10,811
$12,378 233,587 $34 - $12,378
233,587
kWh
$34
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
$