IAC logo
IAC Assessment: TN0462
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0462
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1992
Principal Product PAPERBOARD CARTONS
NAICS n/a
SIC 2657 - Folding Paperboard Boxes
Sales $10,000,000-$50,000,000
# of Employees 117
Plant Area (Sq.Ft.) 0
Annual Production 24,000,000 Pounds
Production Hrs. Annual 6,240
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $78,904 1,202,814 kWh $0.07
Natural Gas $36,380 5,843 MMBtu $6.23
TOTAL ENERGY COSTS $115,284
RECOMMENDED SAVINGS* $24,022 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7245 USE DIRECT AIR SUPPLY TO EXHAUST HOODS Savings:
$12,369
Cost:
$9,880
- - $12,369 1,995 - - -
-
kWh
$12,369
1,995
MMBtu
-
-
$
02: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$2,871
Cost:
$5,400
- - $2,871 463 - - -
-
kWh
$2,871
463
MMBtu
-
-
$
03: 2.7123 KEEP LAMPS AND REFLECTORS CLEAN Savings:
$5,076
Cost:
$5,335
$4,739 71,805 - - $337 - $4,739
71,805
kWh
-
-
MMBtu
$337
-
$
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,393
Cost:
$400
$1,393 21,102 - - - - $1,393
21,102
kWh
-
-
MMBtu
-
-
$
05: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$422
Cost:
$660
- - $422 68 - - -
-
kWh
$422
68
MMBtu
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,504
Cost:
$390
$1,760 26,671 - - $(-256) - $1,760
26,671
kWh
-
-
MMBtu
$(-256)
-
$
07: 2.6232 INSTALL SET-BACK TIMERS Savings:
$271
Cost:
-
$271 4,103 - - - - $271
4,103
kWh
-
-
MMBtu
-
-
$
08: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$116
Cost:
-
$116 1,758 - - - - $116
1,758
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$24,022
Cost:
$22,065
$8,279 125,439 $15,662 2,526 $81 - $8,279
125,439
kWh
$15,662
2,526
MMBtu
$81
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes