IAC logo
IAC Assessment: TN0473
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0473
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1992
Principal Product PLASTIC PARTS
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 420
Plant Area (Sq.Ft.) 0
Annual Production 11,000,000 Pounds
Production Hrs. Annual 8,736
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $897,366 18,084,701 kWh $0.05
Natural Gas $47,554 7,672 MMBtu $6.20
TOTAL ENERGY COSTS $944,920
RECOMMENDED SAVINGS* $109,121 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.2511 INSULATE BARE EQUIPMENT Savings:
$77,374
Cost:
$825
$77,374 1,547,480 - - - - $77,374
1,547,480
kWh
-
-
MMBtu
-
-
$
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$766
Cost:
$3,150
$766 15,240 - - - - $766
15,240
kWh
-
-
MMBtu
-
-
$
03: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$3,509
Cost:
$2,980
- - $3,509 566 - - -
-
kWh
$3,509
566
MMBtu
-
-
$
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$6,052
Cost:
$9,972
$6,052 121,043 - - - - $6,052
121,043
kWh
-
-
MMBtu
-
-
$
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$5,554
Cost:
$3,200
$5,554 111,079 - - - - $5,554
111,079
kWh
-
-
MMBtu
-
-
$
06: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$8,546
Cost:
$120
$5,246 104,924 - - $3,300 - $5,246
104,924
kWh
-
-
MMBtu
$3,300
-
$
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$5,232
Cost:
$903
$5,232 104,631 - - - - $5,232
104,631
kWh
-
-
MMBtu
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,088
Cost:
$608
$2,696 53,927 - - $(-608) - $2,696
53,927
kWh
-
-
MMBtu
$(-608)
-
$
TOTAL RECOMMENDED Savings:
$109,121
Cost:
$21,758
$102,920 2,058,324 $3,509 566 $2,692 - $102,920
2,058,324
kWh
$3,509
566
MMBtu
$2,692
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes