Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1992
Principal Product PRINTED,FINISHED FABRIC
NAICS n/a
SIC 2261 - Finishing Plants, Cotton
Sales $10,000,000-$50,000,000
# of Employees 250
Plant Area (Sq.Ft.) 0
Annual Production 225,000 Thousand Feet
Production Hrs. Annual 8,400
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $575,112 12,381,301 kWh $0.05
Natural Gas $384,704 298,402 MMBtu $1.29
Coal $640,720 448,448 MMBtu $1.43
TOTAL ENERGY COSTS $1,600,536
RECOMMENDED SAVINGS* $96,080 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Coal Administrative Changes Electricity Usage Coal Administrative Changes
$ kWh $ MMBtu $ $
01: 2.2511 INSULATE BARE EQUIPMENT Savings:
$9,523
Cost:
$2,425
- - $9,523 6,666 - - -
-
kWh
$9,523
6,666
MMBtu
-
-
$
02: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$8,013
Cost:
$2,350
- - $8,013 5,609 - - -
-
kWh
$8,013
5,609
MMBtu
-
-
$
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$56,030
Cost:
$36,440
$56,030 1,218,054 - - - - $56,030
1,218,054
kWh
-
-
MMBtu
-
-
$
04: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$4,854
Cost:
$1,100
- - $4,854 3,398 - - -
-
kWh
$4,854
3,398
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$14,303
Cost:
$2,307
$16,610 361,079 - - $(-2,307) - $16,610
361,079
kWh
-
-
MMBtu
$(-2,307)
-
$
06: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$3,357
Cost:
-
$3,357 72,978 - - - - $3,357
72,978
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$96,080
Cost:
$44,622
$75,997 1,652,111 $22,390 15,673 $(-2,307) - $75,997
1,652,111
kWh
$22,390
15,673
MMBtu
$(-2,307)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Coal Administrative Changes Electricity Usage Coal Administrative Changes