IAC logo
IAC Assessment: TN0486
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0486
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1993
Principal Product Plastic Molded Houseware Products
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 160
Plant Area (Sq.Ft.) 220,000
Annual Production 6,000,000 Pieces
Production Hrs. Annual 6,000
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $304,868 6,253,810 kWh $0.05
Natural Gas $43,268 8,508 MMBtu $5.09
TOTAL ENERGY COSTS $348,136
RECOMMENDED SAVINGS* $20,016 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,431
#|Description Savings
Cost
Status Electricity Usage Electricity Usage
$ kWh
01: 2.2511 INSULATE BARE EQUIPMENT Savings:
$7,295
Cost:
$825
$7,295 148,886 $7,295
148,886
kWh
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$7,655
Cost:
-
$7,655 156,213 $7,655
156,213
kWh
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,054
Cost:
$2,900
$2,054 41,911 $2,054
41,911
kWh
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,089
Cost:
$590
$1,089 23,154 $1,089
23,154
kWh
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,032
Cost:
$100
$1,032 21,102 $1,032
21,102
kWh
06: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$546
Cost:
$890
$546 11,137 $546
11,137
kWh
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$345
Cost:
$576
$345 7,034 $345
7,034
kWh
TOTAL RECOMMENDED Savings:
$20,016
Cost:
$5,881
$20,016 409,437 $20,016
409,437
kWh
TOTAL IMPLEMENTED Savings:
$3,431
Cost:
$3,576
$3,431 70,047 $3,431
70,047
kWh