IAC logo
IAC Assessment: TN0494
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0494
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1993
Principal Product children's clothing, shorts and pant
NAICS n/a
SIC 2361 - Girls', Children's, and Infants' Dresses, Blouses, and Shirts
Sales $1,000,000-$5,000,000
# of Employees 255
Plant Area (Sq.Ft.) 42,421
Annual Production 3,720,000 Pieces
Production Hrs. Annual 2,400
Location (State) VA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $60,894 1,194,021 kWh $0.05
Natural Gas $465 67 MMBtu $6.94
TOTAL ENERGY COSTS $61,359
RECOMMENDED SAVINGS* $15,135 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $15,135
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$7,383
Cost:
$26,368
$7,383 130,422 - - $7,383
130,422
kWh
-
-
MMBtu
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$5,037
Cost:
-
$5,037 98,769 - - $5,037
98,769
kWh
-
-
MMBtu
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$957
Cost:
$1,710
$957 18,757 - - $957
18,757
kWh
-
-
MMBtu
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$643
Cost:
$406
$643 12,603 - - $643
12,603
kWh
-
-
MMBtu
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$338
Cost:
$840
$90 1,758 $248 48 $90
1,758
kWh
$248
48
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$463
Cost:
$1,686
$463 9,086 - - $463
9,086
kWh
-
-
MMBtu
07: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$314
Cost:
-
$314 6,155 - - $314
6,155
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$15,135
Cost:
$31,010
$14,887 277,550 $248 48 $14,887
277,550
kWh
$248
48
MMBtu
TOTAL IMPLEMENTED Savings:
$15,135
Cost:
$31,010
$14,887 277,550 $248 48 $14,887
277,550
kWh
$248
48
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas