IAC logo
IAC Assessment: TN0495
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0495
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1993
Principal Product Childrens' Apparel
NAICS n/a
SIC 2361 - Girls', Children's, and Infants' Dresses, Blouses, and Shirts
Sales $10,000,000-$50,000,000
# of Employees 340
Plant Area (Sq.Ft.) 60,800
Annual Production 3,600,000 Pieces
Production Hrs. Annual 3,300
Location (State) VA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $80,366 1,656,506 kWh $0.05
Natural Gas $36,066 6,414 MMBtu $5.62
TOTAL ENERGY COSTS $116,432
RECOMMENDED SAVINGS* $24,134 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $15,436
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$4,894
Cost:
$1,500
- - $4,894 874 -
-
kWh
$4,894
874
MMBtu
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$7,339
Cost:
$480
$7,339 124,267 - - $7,339
124,267
kWh
-
-
MMBtu
03: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$6,425
Cost:
$17,573
$6,425 124,267 - - $6,425
124,267
kWh
-
-
MMBtu
04: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$1,551
Cost:
$285
- - $1,551 277 -
-
kWh
$1,551
277
MMBtu
05: 2.2163 USE MINIMUM STEAM OPERATING PRESSURE Savings:
$1,238
Cost:
-
- - $1,238 221 -
-
kWh
$1,238
221
MMBtu
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$876
Cost:
$775
$876 17,878 - - $876
17,878
kWh
-
-
MMBtu
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$776
Cost:
$841
$776 15,826 - - $776
15,826
kWh
-
-
MMBtu
08: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$460
Cost:
$410
$460 9,379 - - $460
9,379
kWh
-
-
MMBtu
09: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$345
Cost:
-
$345 7,034 - - $345
7,034
kWh
-
-
MMBtu
10: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$230
Cost:
$490
$230 4,689 - - $230
4,689
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$24,134
Cost:
$22,354
$16,451 303,340 $7,683 1,372 $16,451
303,340
kWh
$7,683
1,372
MMBtu
TOTAL IMPLEMENTED Savings:
$15,436
Cost:
$3,881
$8,991 157,971 $6,445 1,151 $8,991
157,971
kWh
$6,445
1,151
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas