IAC Assessment: TN0500
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1993
Principal Product Railcar bearing assemblies
NAICS n/a
SIC 3471 - Plating And Polishing
Sales $10,000,000-$50,000,000
# of Employees 120
Plant Area (Sq.Ft.) 40,000
Annual Production 320 Tons
Production Hrs. Annual 6,240
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $103,386 2,079,426 kWh $0.05
Natural Gas $47,808 8,408 MMBtu $5.69
TOTAL ENERGY COSTS $151,194
RECOMMENDED SAVINGS* $8,330 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,436
#|Description Savings
Cost
Status Electricity Usage Electricity Usage
$ kWh
01: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$4,608
Cost:
$5,042
$4,608 84,994 $4,608
84,994
kWh
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,890
Cost:
$1,460
$1,890 37,808 $1,890
37,808
kWh
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$645
Cost:
-
$645 12,896 $645
12,896
kWh
04: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$513
Cost:
-
$513 10,258 $513
10,258
kWh
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$366
Cost:
$242
$366 7,327 $366
7,327
kWh
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$249
Cost:
$440
$249 4,982 $249
4,982
kWh
07: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$59
Cost:
$560
$59 1,172 $59
1,172
kWh
TOTAL RECOMMENDED Savings:
$8,330
Cost:
$7,744
$8,330 159,437 $8,330
159,437
kWh
TOTAL IMPLEMENTED Savings:
$7,436
Cost:
$7,304
$7,436 141,559 $7,436
141,559
kWh
Savings
Cost
$ kWh
Electricity Usage Electricity Usage