IAC logo
IAC Assessment: TN0505
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0505
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1993
Principal Product Refigeration fittings and valves
NAICS n/a
SIC 3432 - Plumbing Fixture Fittings And Trim
Sales $10,000,000-$50,000,000
# of Employees 220
Plant Area (Sq.Ft.) 88,000
Annual Production 0 Units
Production Hrs. Annual 6,240
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $230,628 4,110,492 kWh $0.06
Natural Gas $35,618 6,285 MMBtu $5.67
TOTAL ENERGY COSTS $266,246
RECOMMENDED SAVINGS* $44,834 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $34,299
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$10,734
Cost:
$4,088
$10,734 191,676 - - $10,734
191,676
kWh
-
-
MMBtu
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$10,127
Cost:
$730
$10,127 180,832 - - $10,127
180,832
kWh
-
-
MMBtu
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$4,856
Cost:
$3,880
$4,497 80,305 $359 63 $4,497
80,305
kWh
$359
63
MMBtu
04: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$6,669
Cost:
$15,914
$6,669 108,441 - - $6,669
108,441
kWh
-
-
MMBtu
05: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$5,055
Cost:
$4,000
$5,055 90,270 - - $5,055
90,270
kWh
-
-
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$624
Cost:
$451
$624 11,137 - - $624
11,137
kWh
-
-
MMBtu
07: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$525
Cost:
$1,380
$525 9,379 - - $525
9,379
kWh
-
-
MMBtu
08: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$6,244
Cost:
$15,800
$6,244 - - - $6,244
-
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$44,834
Cost:
$46,243
$44,475 672,040 $359 63 $44,475
672,040
kWh
$359
63
MMBtu
TOTAL IMPLEMENTED Savings:
$34,299
Cost:
$37,912
$34,299 490,328 - - $34,299
490,328
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas