IAC Assessment: TN0508
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0508
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1994
Principal Product Pre-engineered metal buildings
NAICS n/a
SIC 3448 - Prefabricated Metal Buildings
Sales $10,000,000-$50,000,000
# of Employees 275
Plant Area (Sq.Ft.) 190,000
Annual Production 3,500 Tons
Production Hrs. Annual 5,616
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $152,357 3,809,203 kWh $0.04
Natural Gas $81,301 15,635 MMBtu $5.20
TOTAL ENERGY COSTS $233,658
RECOMMENDED SAVINGS* $40,521 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,009
#|Description Savings
Cost
Status Electricity Usage Electricity Usage
$ kWh
01: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$1,313
Cost:
-
$1,313 32,825 $1,313
32,825
kWh
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$1,160
Cost:
-
$1,160 29,015 $1,160
29,015
kWh
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$199
Cost:
$250
$199 4,982 $199
4,982
kWh
04: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$4,849
Cost:
$240
$4,849 - $4,849
-
kWh
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$33,000
Cost:
$15,800
$33,000 - $33,000
-
kWh
TOTAL RECOMMENDED Savings:
$40,521
Cost:
$16,290
$40,521 66,822 $40,521
66,822
kWh
TOTAL IMPLEMENTED Savings:
$6,009
Cost:
$240
$6,009 29,015 $6,009
29,015
kWh
Savings
Cost
$ kWh
Electricity Usage Electricity Usage