Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1994
Principal Product Industrial Thread
NAICS n/a
SIC 2284 - Thread Mills
Sales $10,000,000-$50,000,000
# of Employees 350
Plant Area (Sq.Ft.) 235,000
Annual Production 10,000,000 Pounds
Production Hrs. Annual 8,400
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,843,952 39,128,078 kWh $0.05
TOTAL ENERGY COSTS $1,843,952
RECOMMENDED SAVINGS* $125,038 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Usage
$ kWh
01: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$64,659
Cost:
$115,952
$64,659 1,225,088 $64,659
1,225,088
kWh
02: 2.6127 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT Savings:
$24,016
Cost:
-
$24,016 541,618 $24,016
541,618
kWh
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$11,557
Cost:
$7,667
$11,557 245,897 $11,557
245,897
kWh
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$8,554
Cost:
$2,285
$8,554 182,005 $8,554
182,005
kWh
05: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$6,734
Cost:
-
$6,734 143,318 $6,734
143,318
kWh
06: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$3,664
Cost:
$480
$3,664 77,960 $3,664
77,960
kWh
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,278
Cost:
$4,000
$3,278 69,754 $3,278
69,754
kWh
08: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$2,576
Cost:
$1,040
$2,576 54,807 $2,576
54,807
kWh
TOTAL RECOMMENDED Savings:
$125,038
Cost:
$131,424
$125,038 2,540,447 $125,038
2,540,447
kWh
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - -
-
kWh
Savings
Cost
$ kWh
Electricity Usage Electricity Usage