IAC Assessment: TN0527
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0527
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1994
Principal Product Electroplated automotive and appliance parts
NAICS n/a
SIC 3471 - Plating And Polishing
Sales $5,000,000-$10,000,000
# of Employees 120
Plant Area (Sq.Ft.) 90,000
Annual Production 16,000,000 Pieces
Production Hrs. Annual 4,290
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $178,265 3,196,952 kWh $0.06
Natural Gas $160,029 44,502 MMBtu $3.60
TOTAL ENERGY COSTS $338,294
RECOMMENDED SAVINGS* $73,608 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $39,415
#|Description Savings
Cost
Status Electricity Usage Natural Gas Water Disposal Other Liquid (haz) Solid Waste (non-haz) Administrative Changes Primary Raw Material Electricity Usage Natural Gas Water Disposal Other Liquid (haz) Solid Waste (non-haz) Administrative Changes Primary Raw Material
$ kWh $ MMBtu $ Tgal $ gal $ lb $ $ $ $
01: 2.1135 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY Savings:
$9,612
Cost:
$5,000
- - $9,612 2,670 - - - - - - - - - - -
-
kWh
$9,612
2,670
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$4,817
Cost:
$3,055
- - $4,817 1,338 - - - - - - - - - - -
-
kWh
$4,817
1,338
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
03: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$1,930
Cost:
$450
- - $1,930 536 - - - - - - - - - - -
-
kWh
$1,930
536
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,444
Cost:
$1,500
- - $1,444 401 - - - - - - - - - - -
-
kWh
$1,444
401
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$360
Cost:
$160
- - $360 100 - - - - - - - - - - -
-
kWh
$360
100
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$853
Cost:
$210
$853 15,240 - - - - - - - - - - - - $853
15,240
kWh
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$394
Cost:
-
$394 7,034 - - - - - - - - - - - - $394
7,034
kWh
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
08: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$279
Cost:
$410
$279 4,982 - - - - - - - - - - - - $279
4,982
kWh
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
09: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$263
Cost:
-
$263 4,689 - - - - - - - - - - - - $263
4,689
kWh
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$246
Cost:
$262
$246 4,396 - - - - - - - - - - - - $246
4,396
kWh
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
11: 3.4113 TREAT AND REUSE RINSE WATERS Savings:
$27,040
Cost:
$44,760
- - - - $27,040 4,800,000 - - - - - - - - -
-
kWh
-
-
MMBtu
$27,040
4,800,000
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
12: 3.1244 REDUCE SOLUTION DRAG-OUT TO PREVENT SOLUTION LOSS Savings:
$17,730
Cost:
$7,600
- - - - - - $627 2,510 - - - - $17,103 - -
-
kWh
-
-
MMBtu
-
-
Tgal
$627
2,510
gal
-
-
lb
-
-
$
$17,103
-
$
13: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$4,400
Cost:
$5,400
- - - - - - - - - - $4,400 - - - -
-
kWh
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
$4,400
-
$
-
-
$
14: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$2,160
Cost:
$8,480
- - - - - - - - $2,160 58,000 - - - - -
-
kWh
-
-
MMBtu
-
-
Tgal
-
-
gal
$2,160
58,000
lb
-
-
$
-
-
$
15: 3.5314 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE Savings:
$2,080
Cost:
$300
- - - - - - - - $2,080 1,140 - - - - -
-
kWh
-
-
MMBtu
-
-
Tgal
-
-
gal
$2,080
1,140
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$73,608
Cost:
$77,587
$2,035 36,341 $18,163 5,045 $27,040 4,800,000 $627 2,510 $4,240 59,140 $4,400 - $17,103 - $2,035
36,341
kWh
$18,163
5,045
MMBtu
$27,040
4,800,000
Tgal
$627
2,510
gal
$4,240
59,140
lb
$4,400
-
$
$17,103
-
$
TOTAL IMPLEMENTED Savings:
$39,415
Cost:
$26,717
$1,362 24,325 $18,163 5,045 - - $627 2,510 $2,160 58,000 - - $17,103 - $1,362
24,325
kWh
$18,163
5,045
MMBtu
-
-
Tgal
$627
2,510
gal
$2,160
58,000
lb
-
-
$
$17,103
-
$
Savings
Cost
$ kWh $ MMBtu $ Tgal $ gal $ lb $ $ $ $
Electricity Usage Natural Gas Water Disposal Other Liquid (haz) Solid Waste (non-haz) Administrative Changes Primary Raw Material Electricity Usage Natural Gas Water Disposal Other Liquid (haz) Solid Waste (non-haz) Administrative Changes Primary Raw Material