IAC logo
IAC Assessment: TN0528
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0528
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1994
Principal Product Heavy vehicle rebuilt manual transmissions and assorted repl
NAICS n/a
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 98,000
Annual Production 9,100 Pieces
Production Hrs. Annual 4,680
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $110,077 1,806,858 kWh $0.06
Natural Gas $23,728 3,365 MMBtu $7.05
TOTAL ENERGY COSTS $133,805
RECOMMENDED SAVINGS* $34,268 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Other Liquid (haz) Solid Waste (non-haz) Electricity Usage Natural Gas Other Liquid (haz) Solid Waste (non-haz)
$ kWh $ MMBtu $ gal $ lb
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$15,187
Cost:
$6,700
$8,939 146,542 $6,248 880 - - - - $8,939
146,542
kWh
$6,248
880
MMBtu
-
-
gal
-
-
lb
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$3,236
Cost:
$4,060
$3,236 53,048 - - - - - - $3,236
53,048
kWh
-
-
MMBtu
-
-
gal
-
-
lb
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,967
Cost:
$365
$1,967 32,239 - - - - - - $1,967
32,239
kWh
-
-
MMBtu
-
-
gal
-
-
lb
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$858
Cost:
-
$858 14,068 - - - - - - $858
14,068
kWh
-
-
MMBtu
-
-
gal
-
-
lb
05: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$715
Cost:
-
$715 11,723 - - - - - - $715
11,723
kWh
-
-
MMBtu
-
-
gal
-
-
lb
06: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$572
Cost:
$330
$572 9,379 - - - - - - $572
9,379
kWh
-
-
MMBtu
-
-
gal
-
-
lb
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$375
Cost:
$275
$375 6,155 - - - - - - $375
6,155
kWh
-
-
MMBtu
-
-
gal
-
-
lb
08: 3.5146 UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID Savings:
$5,815
Cost:
$20,200
- - - - $5,815 13,695 - - -
-
kWh
-
-
MMBtu
$5,815
13,695
gal
-
-
lb
09: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$1,595
Cost:
-
- - - - - - $1,595 24,500 -
-
kWh
-
-
MMBtu
-
-
gal
$1,595
24,500
lb
10: 3.7131 USE A RAG RECYCLE SERVICE Savings:
$1,448
Cost:
-
- - - - - - $1,448 7,000 -
-
kWh
-
-
MMBtu
-
-
gal
$1,448
7,000
lb
11: 3.8314 PURCHASE HIGH MATERIALS IN RETURNABLE BULK CONTAINERS Savings:
$2,500
Cost:
$7,500
- - - - - - $2,500 2,000 -
-
kWh
-
-
MMBtu
-
-
gal
$2,500
2,000
lb
TOTAL RECOMMENDED Savings:
$34,268
Cost:
$39,430
$16,662 273,154 $6,248 880 $5,815 13,695 $5,543 33,500 $16,662
273,154
kWh
$6,248
880
MMBtu
$5,815
13,695
gal
$5,543
33,500
lb
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
MMBtu
-
-
gal
-
-
lb
Savings
Cost
$ kWh $ MMBtu $ gal $ lb
Electricity Usage Natural Gas Other Liquid (haz) Solid Waste (non-haz) Electricity Usage Natural Gas Other Liquid (haz) Solid Waste (non-haz)