IAC Assessment: TN0547
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1995
Principal Product Pre-engineered metal buildings
NAICS n/a
SIC 3448 - Prefabricated Metal Buildings
Sales $50,000,000-$100,000,000
# of Employees 250
Plant Area (Sq.Ft.) 185,000
Annual Production 40,000 Tons
Production Hrs. Annual 7,344
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $104,166 1,827,374 kWh $0.06
Natural Gas $40,077 6,747 MMBtu $5.94
TOTAL ENERGY COSTS $144,243
RECOMMENDED SAVINGS* $11,386 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,189
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$8,342
Cost:
$5,800
$1,604 50,117 $6,738 1,123 $1,604
50,117
kWh
$6,738
1,123
MMBtu
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,062
Cost:
$1,800
$1,062 33,411 - - $1,062
33,411
kWh
-
-
MMBtu
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$716
Cost:
$468
$716 14,947 - - $716
14,947
kWh
-
-
MMBtu
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$131
Cost:
$98
$131 4,103 - - $131
4,103
kWh
-
-
MMBtu
05: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$1,135
Cost:
-
$1,135 - - - $1,135
-
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$11,386
Cost:
$8,166
$4,648 102,578 $6,738 1,123 $4,648
102,578
kWh
$6,738
1,123
MMBtu
TOTAL IMPLEMENTED Savings:
$9,189
Cost:
$6,366
$2,451 69,167 $6,738 1,123 $2,451
69,167
kWh
$6,738
1,123
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas