IAC logo
IAC Assessment: TN0557
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0557
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1995
Principal Product Icemakers, circuit boards, and bomb fuse cables
NAICS n/a
SIC 3469 - Metal Stampings, Nec
Sales $50,000,000-$100,000,000
# of Employees 725
Plant Area (Sq.Ft.) 162,000
Annual Production 500,000 Pieces
Production Hrs. Annual 6,240
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $294,846 4,871,337 kWh $0.06
Natural Gas $11,883 2,132 MMBtu $5.57
TOTAL ENERGY COSTS $317,524
RECOMMENDED SAVINGS* $49,461 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,371
#|Description Savings
Cost
Status Electricity Usage Natural Gas Other Liquid (haz) Gaseous Waste Ancillary Material Cost Electricity Usage Natural Gas Other Liquid (haz) Gaseous Waste Ancillary Material Cost
$ kWh $ MMBtu $ gal $ lb $ $
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$7,423
Cost:
$5,320
$4,836 109,906 $2,587 462 - - - - - - $4,836
109,906
kWh
$2,587
462
MMBtu
-
-
gal
-
-
lb
-
-
$
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,157
Cost:
$900
$1,157 21,102 - - - - - - - - $1,157
21,102
kWh
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
03: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$1,030
Cost:
-
$1,030 18,757 - - - - - - - - $1,030
18,757
kWh
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$761
Cost:
$788
$761 17,292 - - - - - - - - $761
17,292
kWh
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
05: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$567
Cost:
$1,275
$567 12,896 - - - - - - - - $567
12,896
kWh
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
06: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$27,755
Cost:
$24,000
- - - - $19,380 570 $8,375 7,100 - - -
-
kWh
-
-
MMBtu
$19,380
570
gal
$8,375
7,100
lb
-
-
$
07: 3.8143 RECYCLE CLEANING SOLVENT AND REUSE Savings:
$10,768
Cost:
$12,400
- - - - $6,089 428 - - $4,679 - -
-
kWh
-
-
MMBtu
$6,089
428
gal
-
-
lb
$4,679
-
$
TOTAL RECOMMENDED Savings:
$49,461
Cost:
$44,683
$8,351 179,953 $2,587 462 $25,469 998 $8,375 7,100 $4,679 - $8,351
179,953
kWh
$2,587
462
MMBtu
$25,469
998
gal
$8,375
7,100
lb
$4,679
-
$
TOTAL IMPLEMENTED Savings:
$10,371
Cost:
$7,008
$7,784 167,057 $2,587 462 - - - - - - $7,784
167,057
kWh
$2,587
462
MMBtu
-
-
gal
-
-
lb
-
-
$
Savings
Cost
$ kWh $ MMBtu $ gal $ lb $ $
Electricity Usage Natural Gas Other Liquid (haz) Gaseous Waste Ancillary Material Cost Electricity Usage Natural Gas Other Liquid (haz) Gaseous Waste Ancillary Material Cost