Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Tennessee |
---|---|
Assessment Year | 1995 |
Principal Product | Water-based polymer products |
NAICS | n/a |
SIC | 2821 - Plastics Materials And Resins |
Sales | $50,000,000-$100,000,000 |
# of Employees | 145 |
Plant Area (Sq.Ft.) | 300,000 |
Annual Production | 90,000,000 Pounds |
Production Hrs. Annual | 6,240 |
Location (State) | SC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $337,385 | 7,613,423 | kWh | $0.04 |
Natural Gas | $310,297 | 80,143 | MMBtu | $3.87 |
TOTAL ENERGY COSTS | $821,602 | |||
RECOMMENDED SAVINGS* | $153,048 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $78,341 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Water Disposal | Solid Waste (non-haz) | Gaseous Waste | Electricity Usage | Natural Gas | Water Disposal | Solid Waste (non-haz) | Gaseous Waste | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | Tgal | $ | lb | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $4,813 Cost: $4,640 |
- | - | $4,813 | 1,234 | - | - | - | - | - | - |
- - kWh |
$4,813 1,234 MMBtu |
- - Tgal |
- - lb |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS |
Savings: $4,419 Cost: $450 |
- | - | $4,419 | 1,133 | - | - | - | - | - | - |
- - kWh |
$4,419 1,133 MMBtu |
- - Tgal |
- - lb |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2153 CLOSE OFF UNNEEDED STEAM LINES |
Savings: $1,156 Cost: - |
- | - | $1,156 | 296 | - | - | - | - | - | - |
- - kWh |
$1,156 296 MMBtu |
- - Tgal |
- - lb |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2163 USE MINIMUM STEAM OPERATING PRESSURE |
Savings: $1,139 Cost: - |
- | - | $1,139 | 292 | - | - | - | - | - | - |
- - kWh |
$1,139 292 MMBtu |
- - Tgal |
- - lb |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $4,209 Cost: $2,000 |
$4,209 | 58,324 | - | - | - | - | - | - | - | - |
$4,209 58,324 kWh |
- - MMBtu |
- - Tgal |
- - lb |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $1,231 Cost: - |
$1,231 | 35,170 | - | - | - | - | - | - | - | - |
$1,231 35,170 kWh |
- - MMBtu |
- - Tgal |
- - lb |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $152 Cost: $60 |
- | - | $152 | 39 | - | - | - | - | - | - |
- - kWh |
$152 39 MMBtu |
- - Tgal |
- - lb |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $963 Cost: $530 |
$963 | 4,689 | - | - | - | - | - | - | - | - |
$963 4,689 kWh |
- - MMBtu |
- - Tgal |
- - lb |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.5311 RECOVER AND REUSE WASTE MATERIAL |
Savings: $26,496 Cost: $26,600 |
- | - | - | - | - | - | - | - | $26,496 | 50,045,000 |
- - kWh |
- - MMBtu |
- - Tgal |
- - lb |
$26,496 50,045,000 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 3.5311 RECOVER AND REUSE WASTE MATERIAL |
Savings: $13,248 Cost: $26,200 |
- | - | - | - | - | - | - | - | $13,248 | 25,022,500 |
- - kWh |
- - MMBtu |
- - Tgal |
- - lb |
$13,248 25,022,500 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 3.7121 IMPROVE HANDLING PRACTICES |
Savings: $45,080 Cost: $25,000 |
- | - | - | - | $18,282 | 3,960,600 | $26,798 | 672,000 | - | - |
- - kWh |
- - MMBtu |
$18,282 3,960,600 Tgal |
$26,798 672,000 lb |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 3.6112 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME |
Savings: $50,142 Cost: $23,600 |
- | - | - | - | - | - | $50,142 | 2,200,000 | - | - |
- - kWh |
- - MMBtu |
- - Tgal |
$50,142 2,200,000 lb |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $153,048 Cost: $109,080 |
$6,403 | 98,183 | $11,679 | 2,994 | $18,282 | 3,960,600 | $76,940 | 2,872,000 | $39,744 | 75,067,500 | $6,403 98,183 kWh |
$11,679 2,994 MMBtu |
$18,282 3,960,600 Tgal |
$76,940 2,872,000 lb |
$39,744 75,067,500 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $78,341 Cost: $52,640 |
$2,194 | 39,859 | $4,571 | 1,172 | $18,282 | 3,960,600 | $26,798 | 672,000 | $26,496 | 50,045,000 | $2,194 39,859 kWh |
$4,571 1,172 MMBtu |
$18,282 3,960,600 Tgal |
$26,798 672,000 lb |
$26,496 50,045,000 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | Tgal | $ | lb | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Water Disposal | Solid Waste (non-haz) | Gaseous Waste | Electricity Usage | Natural Gas | Water Disposal | Solid Waste (non-haz) | Gaseous Waste |