IAC logo
IAC Assessment: TN0571
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0571
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1996
Principal Product Colored envelopes, specialty cards and envelope and card pac
NAICS n/a
SIC 2771 - Greeting Cards
Sales $50,000,000-$100,000,000
# of Employees 260
Plant Area (Sq.Ft.) 192,000
Annual Production 1,400,000,000 Pieces
Production Hrs. Annual 6,960
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $150,525 4,565,065 kWh $0.03
Electricity Demand $94,527 10,956 kW-months/year $8.63
Natural Gas $13,576 2,933 MMBtu $4.63
TOTAL ENERGY COSTS $259,498
RECOMMENDED SAVINGS* $16,764 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,435
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Primary Raw Material Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ gal $ $
01: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$11,520
Cost:
$13,320
- - $11,520 1,200 - - - - - - -
-
kWh
$11,520
1,200
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,933
Cost:
$2,100
$781 25,205 $1,152 120 - - - - - - $781
25,205
kWh
$1,152
120
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
03: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$1,358
Cost:
-
- - - - $1,358 - - - - - -
-
kWh
-
-
kW-months/year
$1,358
-
MMBtu
-
-
gal
-
-
$
04: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$748
Cost:
-
$518 16,706 $230 24 - - - - - - $518
16,706
kWh
$230
24
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
05: 3.8211 CONVERT TO AQUEOUS CLEANING SYSTEM Savings:
$687
Cost:
$1,600
- - - - - - $870 70 $(-183) - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$870
70
gal
$(-183)
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$518
Cost:
$600
$345 11,137 $173 24 - - - - - - $345
11,137
kWh
$173
24
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
TOTAL RECOMMENDED Savings:
$16,764
Cost:
$17,620
$1,644 53,048 $13,075 1,368 $1,358 - $870 70 $(-183) - $1,644
53,048
kWh
$13,075
1,368
kW-months/year
$1,358
-
MMBtu
$870
70
gal
$(-183)
-
$
TOTAL IMPLEMENTED Savings:
$1,435
Cost:
$1,600
$518 16,706 $230 24 - - $870 70 $(-183) - $518
16,706
kWh
$230
24
kW-months/year
-
-
MMBtu
$870
70
gal
$(-183)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Primary Raw Material Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Primary Raw Material