IAC Assessment: TN0573
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0573
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1996
Principal Product Metal Indoor Furniture
NAICS n/a
SIC 2519 - Household Furniture, Nec
Sales $10,000,000-$50,000,000
# of Employees 152
Plant Area (Sq.Ft.) 50,000
Annual Production 55,000 Pieces
Production Hrs. Annual 2,168
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $19,728 437,280 kWh $0.05
Electricity Demand $21,757 2,515 kW-months/year $8.65
LPG $57,213 7,586 MMBtu $7.54
TOTAL ENERGY COSTS $103,258
RECOMMENDED SAVINGS* $26,574 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $14,580
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Fuel Oil #2 Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Fuel Oil #2 Solid Waste (non-haz) Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
01: 2.3192 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS Savings:
$14,000
Cost:
$65,000
- - - - $(-2,500) (-614) - - $(-2,500) - $19,000 - -
-
kWh
-
-
kW-months/year
$(-2,500)
(-614)
MMBtu
-
-
lb
$(-2,500)
-
$
$19,000
-
$
02: 2.4325 UPGRADE CONVEYORS Savings:
$9,029
Cost:
$10,700
$(-79) (-1,758) $(-72) (-12) - - - - $9,180 - - - $(-79)
(-1,758)
kWh
$(-72)
(-12)
kW-months/year
-
-
MMBtu
-
-
lb
$9,180
-
$
-
-
$
03: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$2,596
Cost:
$7,980
$(-50) (-1,172) - - - - $2,696 351,669 $(-50) - - - $(-50)
(-1,172)
kWh
-
-
kW-months/year
-
-
MMBtu
$2,696
351,669
lb
$(-50)
-
$
-
-
$
04: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$369
Cost:
$430
$369 8,206 - - - - - - - - - - $369
8,206
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
05: 2.2531 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR Savings:
$203
Cost:
$560
$203 7,913 - - - - - - - - - - $203
7,913
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$195
Cost:
$140
$92 2,052 $103 12 - - - - - - - - $92
2,052
kWh
$103
12
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
07: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$182
Cost:
-
$79 1,758 $103 12 - - - - - - - - $79
1,758
kWh
$103
12
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$26,574
Cost:
$84,810
$614 16,999 $134 12 $(-2,500) (-614) $2,696 351,669 $6,630 - $19,000 - $614
16,999
kWh
$134
12
kW-months/year
$(-2,500)
(-614)
MMBtu
$2,696
351,669
lb
$6,630
-
$
$19,000
-
$
TOTAL IMPLEMENTED Savings:
$14,580
Cost:
$65,700
$374 11,723 $206 24 $(-2,500) (-614) - - $(-2,500) - $19,000 - $374
11,723
kWh
$206
24
kW-months/year
$(-2,500)
(-614)
MMBtu
-
-
lb
$(-2,500)
-
$
$19,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
Electricity Usage Electricity Demand Fuel Oil #2 Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Fuel Oil #2 Solid Waste (non-haz) Personnel Changes Administrative Changes