IAC logo
IAC Assessment: TN0575
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0575
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1996
Principal Product Business Printed Matter
NAICS n/a
SIC 2752 - Commercial Printing, Lithographic
Sales $5,000,000-$10,000,000
# of Employees 72
Plant Area (Sq.Ft.) 33,000
Annual Production 3,800,000 Pounds
Production Hrs. Annual 8,568
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $35,420 1,000,879 kWh $0.04
Electricity Demand $15,006 2,483 kW-months/year $6.04
Natural Gas $2,087 322 MMBtu $6.48
TOTAL ENERGY COSTS $581,339
RECOMMENDED SAVINGS* $307,454 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $91,814
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ lb $ $ $ $
01: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$214,400
Cost:
$208,880
- - - - $208,000 273,500 $6,400 - - - -
-
kWh
-
-
kW-months/year
$208,000
273,500
lb
$6,400
-
$
-
-
$
02: 3.2176 INCREASE USE OF AUTOMATION Savings:
$87,771
Cost:
$254,000
- - - - $109,871 275,200 - - $(-22,100) - -
-
kWh
-
-
kW-months/year
$109,871
275,200
lb
-
-
$
$(-22,100)
-
$
03: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$2,294
Cost:
$8,300
$(-100) (-3,224) - - - - - - $2,394 - $(-100)
(-3,224)
kWh
-
-
kW-months/year
-
-
lb
-
-
$
$2,394
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,637
Cost:
$2,500
$967 32,239 $670 84 - - - - - - $967
32,239
kWh
$670
84
kW-months/year
-
-
lb
-
-
$
-
-
$
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,240
Cost:
$580
$1,240 41,325 - - - - - - - - $1,240
41,325
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$112
Cost:
$175
$62 2,052 $50 5 - - - - - - $62
2,052
kWh
$50
5
kW-months/year
-
-
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$307,454
Cost:
$474,435
$2,169 72,392 $720 89 $317,871 548,700 $6,400 - $(-19,706) - $2,169
72,392
kWh
$720
89
kW-months/year
$317,871
548,700
lb
$6,400
-
$
$(-19,706)
-
$
TOTAL IMPLEMENTED Savings:
$91,814
Cost:
$264,975
$929 31,067 $720 89 $109,871 275,200 - - $(-19,706) - $929
31,067
kWh
$720
89
kW-months/year
$109,871
275,200
lb
-
-
$
$(-19,706)
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $ $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes