Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Tennessee |
---|---|
Assessment Year | 1996 |
Principal Product | Work Uniforms |
NAICS | n/a |
SIC | 2326 - Men's and Boys' Work Clothing |
Sales | $10,000,000-$50,000,000 |
# of Employees | 124 |
Plant Area (Sq.Ft.) | 54,000 |
Annual Production | 18,000,000 Pieces |
Production Hrs. Annual | 2,095 |
Location (State) | KY |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $31,396 | 839,683 | kWh | $0.04 |
Electricity Demand | $23,541 | 3,032 | kW-months/year | $7.76 |
Natural Gas | $16,817 | 2,503 | MMBtu | $6.72 |
TOTAL ENERGY COSTS | $357,754 | |||
RECOMMENDED SAVINGS* | $30,100 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $1,733 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Ancillary Material Cost | By-product Production | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Ancillary Material Cost | By-product Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE |
Savings: $26,249 Cost: $12,000 |
- | - | - | - | - | - | $3,510 | 20,710 | $(-2,527) | - | $25,266 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$3,510 20,710 lb |
$(-2,527) - $ |
$25,266 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,118 Cost: $526 |
$141 | 4,689 | $1,977 | 204 | - | - | - | - | - | - | - | - |
$141 4,689 kWh |
$1,977 204 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $1,249 Cost: - |
$1,249 | 41,618 | - | - | - | - | - | - | - | - | - | - |
$1,249 41,618 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS |
Savings: $342 Cost: $80 |
- | - | - | - | $342 | 51 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$342 51 MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $142 Cost: - |
$26 | 1,465 | $116 | 12 | - | - | - | - | - | - | - | - |
$26 1,465 kWh |
$116 12 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $30,100 Cost: $12,606 |
$1,416 | 47,772 | $2,093 | 216 | $342 | 51 | $3,510 | 20,710 | $(-2,527) | - | $25,266 | - | $1,416 47,772 kWh |
$2,093 216 kW-months/year |
$342 51 MMBtu |
$3,510 20,710 lb |
$(-2,527) - $ |
$25,266 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $1,733 Cost: $80 |
$1,275 | 43,083 | $116 | 12 | $342 | 51 | - | - | - | - | - | - | $1,275 43,083 kWh |
$116 12 kW-months/year |
$342 51 MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Ancillary Material Cost | By-product Production | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Ancillary Material Cost | By-product Production |