IAC logo
IAC Assessment: TN0577
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0577
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1996
Principal Product Work Uniforms
NAICS n/a
SIC 2326 - Men's and Boys' Work Clothing
Sales $10,000,000-$50,000,000
# of Employees 124
Plant Area (Sq.Ft.) 54,000
Annual Production 18,000,000 Pieces
Production Hrs. Annual 2,095
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $31,396 839,683 kWh $0.04
Electricity Demand $23,541 3,032 kW-months/year $7.76
Natural Gas $16,817 2,503 MMBtu $6.72
TOTAL ENERGY COSTS $357,754
RECOMMENDED SAVINGS* $30,100 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,733
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Ancillary Material Cost By-product Production Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Ancillary Material Cost By-product Production
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
01: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$26,249
Cost:
$12,000
- - - - - - $3,510 20,710 $(-2,527) - $25,266 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$3,510
20,710
lb
$(-2,527)
-
$
$25,266
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,118
Cost:
$526
$141 4,689 $1,977 204 - - - - - - - - $141
4,689
kWh
$1,977
204
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,249
Cost:
-
$1,249 41,618 - - - - - - - - - - $1,249
41,618
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
04: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$342
Cost:
$80
- - - - $342 51 - - - - - - -
-
kWh
-
-
kW-months/year
$342
51
MMBtu
-
-
lb
-
-
$
-
-
$
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$142
Cost:
-
$26 1,465 $116 12 - - - - - - - - $26
1,465
kWh
$116
12
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$30,100
Cost:
$12,606
$1,416 47,772 $2,093 216 $342 51 $3,510 20,710 $(-2,527) - $25,266 - $1,416
47,772
kWh
$2,093
216
kW-months/year
$342
51
MMBtu
$3,510
20,710
lb
$(-2,527)
-
$
$25,266
-
$
TOTAL IMPLEMENTED Savings:
$1,733
Cost:
$80
$1,275 43,083 $116 12 $342 51 - - - - - - $1,275
43,083
kWh
$116
12
kW-months/year
$342
51
MMBtu
-
-
lb
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Ancillary Material Cost By-product Production Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Ancillary Material Cost By-product Production