IAC Assessment: TN0578
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0578
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1996
Principal Product Hydraulic pumps
NAICS n/a
SIC 3561 - Pumps And Pumping Equipment
Sales $10,000,000-$50,000,000
# of Employees 98
Plant Area (Sq.Ft.) 73,000
Annual Production 20,000 Pieces
Production Hrs. Annual 6,732
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $172,533 4,730,950 kWh $0.04
Electricity Demand $56,524 12,182 kW-months/year $4.64
Natural Gas $8,063 1,488 MMBtu $5.42
TOTAL ENERGY COSTS $322,543
RECOMMENDED SAVINGS* $31,647 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $17,959
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (haz) Personnel Changes Administrative Changes Primary Raw Material Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (haz) Personnel Changes Administrative Changes Primary Raw Material
$ kWh $ kW-months/year $ gal $ lb $ $ $ $ $ $
01: 3.2121 CONVERT TO ELECTROSTATIC POWDER COATING Savings:
$10,682
Cost:
$26,600
$(-500) (-13,775) - - - - $2,000 4,397 $5,606 - - - $3,576 - $(-500)
(-13,775)
kWh
-
-
kW-months/year
-
-
gal
$2,000
4,397
lb
$5,606
-
$
-
-
$
$3,576
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,333
Cost:
$21,300
$7,607 211,313 $1,726 372 - - - - - - - - - - $7,607
211,313
kWh
$1,726
372
kW-months/year
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$4,500
Cost:
-
$4,500 124,267 - - - - - - - - - - - - $4,500
124,267
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
04: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$4,126
Cost:
$8,500
- - - - - - - - - - $4,126 - - - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
-
-
$
$4,126
-
$
-
-
$
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,359
Cost:
$2,300
$802 22,274 $557 120 - - - - - - - - - - $802
22,274
kWh
$557
120
kW-months/year
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
06: 3.4115 RECOVER AND REUSE COOLING WATER Savings:
$1,311
Cost:
$2,530
$(-100) (-2,638) - - $862 392,000 - - - - - - $549 - $(-100)
(-2,638)
kWh
-
-
kW-months/year
$862
392,000
gal
-
-
lb
-
-
$
-
-
$
$549
-
$
07: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$336
Cost:
-
$169 4,689 $167 36 - - - - - - - - - - $169
4,689
kWh
$167
36
kW-months/year
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$31,647
Cost:
$61,230
$12,478 346,130 $2,450 528 $862 392,000 $2,000 4,397 $5,606 - $4,126 - $4,125 - $12,478
346,130
kWh
$2,450
528
kW-months/year
$862
392,000
gal
$2,000
4,397
lb
$5,606
-
$
$4,126
-
$
$4,125
-
$
TOTAL IMPLEMENTED Savings:
$17,959
Cost:
$29,800
$12,107 335,580 $1,726 372 - - - - - - $4,126 - - - $12,107
335,580
kWh
$1,726
372
kW-months/year
-
-
gal
-
-
lb
-
-
$
$4,126
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ gal $ lb $ $ $ $ $ $
Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (haz) Personnel Changes Administrative Changes Primary Raw Material Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (haz) Personnel Changes Administrative Changes Primary Raw Material