IAC logo
IAC Assessment: TN0580
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0580
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1996
Principal Product Dyed and finished broad woven cloth
NAICS n/a
SIC 2269 - Finishing Plants, Nec
Sales $10,000,000-$50,000,000
# of Employees 160
Plant Area (Sq.Ft.) 115,000
Annual Production 120,000 Thousand Feet
Production Hrs. Annual 6,000
Location (State) SC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $265,978 5,380,422 kWh $0.05
Electricity Demand $45,870 11,944 kW-months/year $3.84
Natural Gas $324,629 86,043 MMBtu $3.77
TOTAL ENERGY COSTS $765,055
RECOMMENDED SAVINGS* $28,605 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,015
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 3.6112 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME Savings:
$18,501
Cost:
$38,600
- - - - $(-32,930) (-8,666) $39,431 7,297,500 $12,000 - -
-
kWh
-
-
kW-months/year
$(-32,930)
(-8,666)
MMBtu
$39,431
7,297,500
lb
$12,000
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$5,167
Cost:
$5,110
$4,122 84,115 $1,045 264 - - - - - - $4,122
84,115
kWh
$1,045
264
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$3,848
Cost:
$520
$3,848 78,546 - - - - - - - - $3,848
78,546
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$811
Cost:
$394
$431 8,792 $380 96 - - - - - - $431
8,792
kWh
$380
96
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$278
Cost:
$170
$230 4,689 $48 12 - - - - - - $230
4,689
kWh
$48
12
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$28,605
Cost:
$44,794
$8,631 176,142 $1,473 372 $(-32,930) (-8,666) $39,431 7,297,500 $12,000 - $8,631
176,142
kWh
$1,473
372
kW-months/year
$(-32,930)
(-8,666)
MMBtu
$39,431
7,297,500
lb
$12,000
-
$
TOTAL IMPLEMENTED Savings:
$9,015
Cost:
$5,630
$7,970 162,661 $1,045 264 - - - - - - $7,970
162,661
kWh
$1,045
264
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes