Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Tennessee |
---|---|
Assessment Year | 1996 |
Principal Product | Dyed and finished broad woven cloth |
NAICS | n/a |
SIC | 2269 - Finishing Plants, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 160 |
Plant Area (Sq.Ft.) | 115,000 |
Annual Production | 120,000 Thousand Feet |
Production Hrs. Annual | 6,000 |
Location (State) | SC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $265,978 | 5,380,422 | kWh | $0.05 |
Electricity Demand | $45,870 | 11,944 | kW-months/year | $3.84 |
Natural Gas | $324,629 | 86,043 | MMBtu | $3.77 |
TOTAL ENERGY COSTS | $765,055 | |||
RECOMMENDED SAVINGS* | $28,605 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $9,015 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.6112 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME |
Savings: $18,501 Cost: $38,600 |
- | - | - | - | $(-32,930) | (-8,666) | $39,431 | 7,297,500 | $12,000 | - |
- - kWh |
- - kW-months/year |
$(-32,930) (-8,666) MMBtu |
$39,431 7,297,500 lb |
$12,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $5,167 Cost: $5,110 |
$4,122 | 84,115 | $1,045 | 264 | - | - | - | - | - | - |
$4,122 84,115 kWh |
$1,045 264 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $3,848 Cost: $520 |
$3,848 | 78,546 | - | - | - | - | - | - | - | - |
$3,848 78,546 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $811 Cost: $394 |
$431 | 8,792 | $380 | 96 | - | - | - | - | - | - |
$431 8,792 kWh |
$380 96 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $278 Cost: $170 |
$230 | 4,689 | $48 | 12 | - | - | - | - | - | - |
$230 4,689 kWh |
$48 12 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $28,605 Cost: $44,794 |
$8,631 | 176,142 | $1,473 | 372 | $(-32,930) | (-8,666) | $39,431 | 7,297,500 | $12,000 | - | $8,631 176,142 kWh |
$1,473 372 kW-months/year |
$(-32,930) (-8,666) MMBtu |
$39,431 7,297,500 lb |
$12,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $9,015 Cost: $5,630 |
$7,970 | 162,661 | $1,045 | 264 | - | - | - | - | - | - | $7,970 162,661 kWh |
$1,045 264 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes |