IAC logo
IAC Assessment: TN0589
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0589
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1996
Principal Product Oven and BBQ grills
NAICS n/a
SIC 3631 - Household Cooking Equipment
Sales $10,000,000-$50,000,000
# of Employees 60
Plant Area (Sq.Ft.) 60,000
Annual Production 3,000,000 Pieces
Production Hrs. Annual 4,250
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $82,713 2,590,856 kWh $0.03
Electricity Demand $45,539 6,139 kW-months/year $7.42
Natural Gas $14,337 2,306 MMBtu $6.22
TOTAL ENERGY COSTS $143,177
RECOMMENDED SAVINGS* $10,005 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,430
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ lb
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$7,441
Cost:
$2,160
$2,022 67,409 - - $5,419 874 - - $2,022
67,409
kWh
-
-
kW-months/year
$5,419
874
MMBtu
-
-
lb
02: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$1,430
Cost:
$2,280
- - - - $1,430 231 - - -
-
kWh
-
-
kW-months/year
$1,430
231
MMBtu
-
-
lb
03: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE Savings:
$527
Cost:
$636
- - - - - - $527 1,172 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$527
1,172
lb
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$477
Cost:
$90
$44 1,465 $433 48 - - - - $44
1,465
kWh
$433
48
kW-months/year
-
-
MMBtu
-
-
lb
05: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$130
Cost:
$260
$130 4,396 - - - - - - $130
4,396
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
TOTAL RECOMMENDED Savings:
$10,005
Cost:
$5,426
$2,196 73,270 $433 48 $6,849 1,105 $527 1,172 $2,196
73,270
kWh
$433
48
kW-months/year
$6,849
1,105
MMBtu
$527
1,172
lb
TOTAL IMPLEMENTED Savings:
$1,430
Cost:
$2,280
- - - - $1,430 231 - - -
-
kWh
-
-
kW-months/year
$1,430
231
MMBtu
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)