IAC Assessment: TN0593
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0593
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1996
Principal Product Packaged country hams
NAICS n/a
SIC 2013 - Sausages And Other Prepared Meats
Sales $5,000,000-$10,000,000
# of Employees 55
Plant Area (Sq.Ft.) 28,000
Annual Production 4,000,000 Pounds
Production Hrs. Annual 2,340
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $22,230 1,246,776 kWh $0.02
Electricity Demand $9,685 1,116 kW-months/year $8.68
TOTAL ENERGY COSTS $34,016
RECOMMENDED SAVINGS* $160,873 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $34,594
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material By-product Production Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material By-product Production
$ kWh $ kW-months/year $ lb $ $ $ $ $ $ $ $
01: 4.3210 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES Savings:
$92,395
Cost:
$100,000
- - - - - - $(-7,605) - - - - - $100,000 - -
-
kWh
-
-
kW-months/year
-
-
lb
$(-7,605)
-
$
-
-
$
-
-
$
$100,000
-
$
02: 2.4325 UPGRADE CONVEYORS Savings:
$30,420
Cost:
$14,000
- - - - - - $30,420 - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
lb
$30,420
-
$
-
-
$
-
-
$
-
-
$
03: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$25,513
Cost:
$10,000
- - - - $23,721 197,600 - - $1,792 - - - - - -
-
kWh
-
-
kW-months/year
$23,721
197,600
lb
-
-
$
$1,792
-
$
-
-
$
-
-
$
04: 4.2110 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE Savings:
$6,872
Cost:
$25,000
- - - - $375 469 - - - - $6,497 - - - -
-
kWh
-
-
kW-months/year
$375
469
lb
-
-
$
-
-
$
$6,497
-
$
-
-
$
05: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$2,668
Cost:
-
$1,021 24,912 $1,647 192 - - - - - - - - - - $1,021
24,912
kWh
$1,647
192
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
06: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$1,506
Cost:
-
- - - - - - - - $1,506 - - - - - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
$1,506
-
$
-
-
$
-
-
$
07: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$821
Cost:
$3,000
$409 9,965 $412 48 - - - - - - - - - - $409
9,965
kWh
$412
48
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$678
Cost:
$713
$60 1,465 $618 72 - - - - - - - - - - $60
1,465
kWh
$618
72
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$160,873
Cost:
$152,713
$1,490 36,342 $2,677 312 $24,096 198,069 $22,815 - $3,298 - $6,497 - $100,000 - $1,490
36,342
kWh
$2,677
312
kW-months/year
$24,096
198,069
lb
$22,815
-
$
$3,298
-
$
$6,497
-
$
$100,000
-
$
TOTAL IMPLEMENTED Savings:
$34,594
Cost:
$14,000
$1,021 24,912 $1,647 192 - - $30,420 - $1,506 - - - - - $1,021
24,912
kWh
$1,647
192
kW-months/year
-
-
lb
$30,420
-
$
$1,506
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $ $ $ $ $ $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material By-product Production Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material By-product Production