IAC Assessment: TN0594
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0594
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1996
Principal Product Single and multi-wall bags
NAICS n/a
SIC 2673 - Bags: Plastics, Laminated, & Coated
Sales $50,000,000-$100,000,000
# of Employees 410
Plant Area (Sq.Ft.) 640,000
Annual Production 130,000,000 Pieces
Production Hrs. Annual 6,240
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $295,771 9,923,799 kWh $0.03
Electricity Demand $171,932 18,527 kW-months/year $9.28
Natural Gas $236,469 69,165 MMBtu $3.42
TOTAL ENERGY COSTS $5,634,242
RECOMMENDED SAVINGS* $3,392,418 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
01: 3.1192 REDUCE SCRAP PRODUCTION Savings:
$2,603,900
Cost:
$170,000
- - - - - - $2,603,900 3,566,940 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,603,900
3,566,940
lb
-
-
$
-
-
$
02: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$744,968
Cost:
$70,400
- - - - - - $713,768 881,200 $31,200 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$713,768
881,200
lb
$31,200
-
$
-
-
$
03: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$25,470
Cost:
-
$15,650 521,688 $9,820 1,008 - - - - - - - - $15,650
521,688
kWh
$9,820
1,008
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
04: 2.7229 AIR CONDITION ONLY SPACE NECESSARY Savings:
$7,270
Cost:
$12,400
$(-130) (-4,396) - - $7,400 2,176 - - - - - - $(-130)
(-4,396)
kWh
-
-
kW-months/year
$7,400
2,176
MMBtu
-
-
lb
-
-
$
-
-
$
05: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$6,900
Cost:
-
$(-250) (-8,206) - - - - - - $(-250) - $7,400 - $(-250)
(-8,206)
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$(-250)
-
$
$7,400
-
$
06: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$2,380
Cost:
$9,200
$2,380 79,426 - - - - - - - - - - $2,380
79,426
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
07: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$1,530
Cost:
-
$712 23,740 $818 84 - - - - - - - - $712
23,740
kWh
$818
84
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$3,392,418
Cost:
$262,000
$18,362 612,252 $10,638 1,092 $7,400 2,176 $3,317,668 4,448,140 $30,950 - $7,400 - $18,362
612,252
kWh
$10,638
1,092
kW-months/year
$7,400
2,176
MMBtu
$3,317,668
4,448,140
lb
$30,950
-
$
$7,400
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes