IAC logo
IAC Assessment: TN0599
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0599
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1997
Principal Product Commercial aluminum-framed windows
NAICS n/a
SIC 3442 - Metal Doors, Sash, And Trim
Sales $10,000,000-$50,000,000
# of Employees 149
Plant Area (Sq.Ft.) 147,000
Annual Production 52,000 Pieces
Production Hrs. Annual 4,160
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $52,288 1,385,111 kWh $0.04
Electricity Demand $30,412 5,053 kW-months/year $6.02
Electricity Fees $5,350 - $ -
Natural Gas $42,837 6,380 MMBtu $6.71
TOTAL ENERGY COSTS $817,837
RECOMMENDED SAVINGS* $449,520 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes By-product Production Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes By-product Production
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ $
01: 4.4450 INSTALL EQUIPMENT TO MOVE PRODUCT Savings:
$155,710
Cost:
$69,000
$(-90) (-2,931) $(-200) (-24) - - - - $156,000 - - - - - $(-90)
(-2,931)
kWh
$(-200)
(-24)
kW-months/year
-
-
MMBtu
-
-
lb
$156,000
-
$
-
-
$
-
-
$
02: 3.1172 REVISE RAW MATERIAL SPECS Savings:
$128,770
Cost:
-
- - - - - - $197,000 115,000 $(-70,000) - $1,770 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$197,000
115,000
lb
$(-70,000)
-
$
$1,770
-
$
-
-
$
03: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$92,330
Cost:
$32,900
- - - - - - $7,240 6,030 $35,090 - - - $50,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$7,240
6,030
lb
$35,090
-
$
-
-
$
$50,000
-
$
04: 3.1172 REVISE RAW MATERIAL SPECS Savings:
$50,700
Cost:
-
- - - - - - $50,700 360,000 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$50,700
360,000
lb
-
-
$
-
-
$
-
-
$
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$19,720
Cost:
$3,400
$1,820 58,617 - - $17,900 2,670 - - - - - - - - $1,820
58,617
kWh
-
-
kW-months/year
$17,900
2,670
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
06: 2.7145 INSTALL SKYLIGHTS Savings:
$1,180
Cost:
$1,000
$1,180 38,101 - - - - - - - - - - - - $1,180
38,101
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,110
Cost:
$1,110
$230 7,327 $880 108 - - - - - - - - - - $230
7,327
kWh
$880
108
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$449,520
Cost:
$107,410
$3,140 101,114 $680 84 $17,900 2,670 $254,940 481,030 $121,090 - $1,770 - $50,000 - $3,140
101,114
kWh
$680
84
kW-months/year
$17,900
2,670
MMBtu
$254,940
481,030
lb
$121,090
-
$
$1,770
-
$
$50,000
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes By-product Production Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes By-product Production