Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Tennessee |
---|---|
Assessment Year | 1997 |
Principal Product | Rubber automotive hoses |
NAICS | n/a |
SIC | 3069 - Fabricated Rubber Products, Nec |
Sales | $100,000,000-$500,000,000 |
# of Employees | 420 |
Plant Area (Sq.Ft.) | 110,000 |
Annual Production | 14,000,000 Pieces |
Production Hrs. Annual | 8,400 |
Location (State) | NC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $337,409 | 8,016,120 | kWh | $0.04 |
Electricity Demand | $66,402 | 14,542 | kW-months/year | $4.57 |
Electricity Fees | $20,831 | - | $ | - |
Fuel Oil #6 | $596,666 | 146,976 | MMBtu | $4.06 |
TOTAL ENERGY COSTS | $2,773,008 | |||
RECOMMENDED SAVINGS* | $272,060 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $255,750 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Fuel Oil #6 | Solid Waste (non-haz) | Personnel Changes | Primary Raw Material | Electricity Usage | Electricity Demand | Fuel Oil #6 | Solid Waste (non-haz) | Personnel Changes | Primary Raw Material | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 4.445 INSTALL EQUIPMENT TO MOVE PRODUCT |
Savings: $104,110 Cost: $129,700 |
$(-780) | (-19,930) | $(-110) | (-36) | - | - | - | - | $105,000 | - | - | - |
$(-780) (-19,930) kWh |
$(-110) (-36) kW-months/year |
- - MMBtu |
- - lb |
$105,000 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 3.1192 REDUCE SCRAP PRODUCTION |
Savings: $100,760 Cost: $25,700 |
- | - | - | - | - | - | $3,260 | 150,000 | - | - | $97,500 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$3,260 150,000 lb |
- - $ |
$97,500 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1232 KEEP BOILER TUBES CLEAN |
Savings: $39,970 Cost: $70,960 |
- | - | - | - | $39,970 | 9,798 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$39,970 9,798 MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $10,910 Cost: $1,330 |
$9,830 | 252,052 | $1,080 | 360 | - | - | - | - | - | - | - | - |
$9,830 252,052 kWh |
$1,080 360 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2441 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT |
Savings: $10,880 Cost: $25,180 |
- | - | - | - | $10,880 | 2,667 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$10,880 2,667 MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.5218 REUSE / RECYCLE/ SELL RUBBER PRODUCTS |
Savings: $5,430 Cost: $14,800 |
$(-730) | (-18,757) | - | - | - | - | $46,160 | - | $(-40,000) | - | - | - |
$(-730) (-18,757) kWh |
- - kW-months/year |
- - MMBtu |
$46,160 - lb |
$(-40,000) - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $272,060 Cost: $267,670 |
$8,320 | 213,365 | $970 | 324 | $50,850 | 12,465 | $49,420 | 150,000 | $65,000 | - | $97,500 | - | $8,320 213,365 kWh |
$970 324 kW-months/year |
$50,850 12,465 MMBtu |
$49,420 150,000 lb |
$65,000 - $ |
$97,500 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $255,750 Cost: $227,690 |
$9,050 | 232,122 | $970 | 324 | $39,970 | 9,798 | $3,260 | 150,000 | $105,000 | - | $97,500 | - | $9,050 232,122 kWh |
$970 324 kW-months/year |
$39,970 9,798 MMBtu |
$3,260 150,000 lb |
$105,000 - $ |
$97,500 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Fuel Oil #6 | Solid Waste (non-haz) | Personnel Changes | Primary Raw Material | Electricity Usage | Electricity Demand | Fuel Oil #6 | Solid Waste (non-haz) | Personnel Changes | Primary Raw Material |