IAC Assessment: TN0605
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0605
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1997
Principal Product Rubber automotive hoses
NAICS n/a
SIC 3069 - Fabricated Rubber Products, Nec
Sales $100,000,000-$500,000,000
# of Employees 420
Plant Area (Sq.Ft.) 110,000
Annual Production 14,000,000 Pieces
Production Hrs. Annual 8,400
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $337,409 8,016,120 kWh $0.04
Electricity Demand $66,402 14,542 kW-months/year $4.57
Electricity Fees $20,831 - $ -
Fuel Oil #6 $596,666 146,976 MMBtu $4.06
TOTAL ENERGY COSTS $2,773,008
RECOMMENDED SAVINGS* $272,060 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $255,750
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Fuel Oil #6 Solid Waste (non-haz) Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Fuel Oil #6 Solid Waste (non-haz) Personnel Changes Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
01: 4.445 INSTALL EQUIPMENT TO MOVE PRODUCT Savings:
$104,110
Cost:
$129,700
$(-780) (-19,930) $(-110) (-36) - - - - $105,000 - - - $(-780)
(-19,930)
kWh
$(-110)
(-36)
kW-months/year
-
-
MMBtu
-
-
lb
$105,000
-
$
-
-
$
02: 3.1192 REDUCE SCRAP PRODUCTION Savings:
$100,760
Cost:
$25,700
- - - - - - $3,260 150,000 - - $97,500 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$3,260
150,000
lb
-
-
$
$97,500
-
$
03: 2.1232 KEEP BOILER TUBES CLEAN Savings:
$39,970
Cost:
$70,960
- - - - $39,970 9,798 - - - - - - -
-
kWh
-
-
kW-months/year
$39,970
9,798
MMBtu
-
-
lb
-
-
$
-
-
$
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$10,910
Cost:
$1,330
$9,830 252,052 $1,080 360 - - - - - - - - $9,830
252,052
kWh
$1,080
360
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
05: 2.2441 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT Savings:
$10,880
Cost:
$25,180
- - - - $10,880 2,667 - - - - - - -
-
kWh
-
-
kW-months/year
$10,880
2,667
MMBtu
-
-
lb
-
-
$
-
-
$
06: 3.5218 REUSE / RECYCLE/ SELL RUBBER PRODUCTS Savings:
$5,430
Cost:
$14,800
$(-730) (-18,757) - - - - $46,160 - $(-40,000) - - - $(-730)
(-18,757)
kWh
-
-
kW-months/year
-
-
MMBtu
$46,160
-
lb
$(-40,000)
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$272,060
Cost:
$267,670
$8,320 213,365 $970 324 $50,850 12,465 $49,420 150,000 $65,000 - $97,500 - $8,320
213,365
kWh
$970
324
kW-months/year
$50,850
12,465
MMBtu
$49,420
150,000
lb
$65,000
-
$
$97,500
-
$
TOTAL IMPLEMENTED Savings:
$255,750
Cost:
$227,690
$9,050 232,122 $970 324 $39,970 9,798 $3,260 150,000 $105,000 - $97,500 - $9,050
232,122
kWh
$970
324
kW-months/year
$39,970
9,798
MMBtu
$3,260
150,000
lb
$105,000
-
$
$97,500
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
Electricity Usage Electricity Demand Fuel Oil #6 Solid Waste (non-haz) Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Fuel Oil #6 Solid Waste (non-haz) Personnel Changes Primary Raw Material