IAC logo
IAC Assessment: TN0609
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0609
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1997
Principal Product Industrial metal-working tools (inserts)
NAICS n/a
SIC 3545 - Machine Tool Accessories
Sales $100,000,000-$500,000,000
# of Employees 86
Plant Area (Sq.Ft.) 23,000
Annual Production 33,000,000 Pieces
Production Hrs. Annual 6,600
Location (State) SC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $175,560 2,988,277 kWh $0.06
Electricity Demand $28,084 8,906 kW-months/year $3.15
Electricity Fees $816 - $ -
Natural Gas $6,415 1,082 MMBtu $5.93
TOTAL ENERGY COSTS $331,265
RECOMMENDED SAVINGS* $173,220 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,330
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Other Liquid (haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Other Liquid (haz) Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ gal $ $ $ $
01: 4.4310 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY Savings:
$83,060
Cost:
$19,080
$(-100) (-1,758) - - - - - - - - $83,160 - - - $(-100)
(-1,758)
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
gal
$83,160
-
$
-
-
$
02: 3.8142 DISTILL CONTAMINATED SOLVENTS FOR REUSE Savings:
$64,970
Cost:
$45,880
- - - - - - - - $16,830 8,604 $1,160 - $46,980 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$16,830
8,604
gal
$1,160
-
$
$46,980
-
$
03: 3.1242 ALLOW DRAINAGE BEFORE WITHDRAWING OBJECT Savings:
$10,970
Cost:
$5,080
- - - - - - - - $3,130 2,609 $260 - $7,580 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$3,130
2,609
gal
$260
-
$
$7,580
-
$
04: 3.3131 USE EVAPORATION TO CONCENTRATE MATERIAL Savings:
$8,030
Cost:
$20,880
$(-810) (-40,445) - - - - $8,840 13,660 - - - - - - $(-810)
(-40,445)
kWh
-
-
kW-months/year
-
-
MMBtu
$8,840
13,660
gal
-
-
gal
-
-
$
-
-
$
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$5,330
Cost:
$6,200
$4,840 86,460 - - $490 83 - - - - - - - - $4,840
86,460
kWh
-
-
kW-months/year
$490
83
MMBtu
-
-
gal
-
-
gal
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$860
Cost:
$600
$740 13,189 $120 36 - - - - - - - - - - $740
13,189
kWh
$120
36
kW-months/year
-
-
MMBtu
-
-
gal
-
-
gal
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$173,220
Cost:
$97,720
$4,670 57,446 $120 36 $490 83 $8,840 13,660 $19,960 11,213 $84,580 - $54,560 - $4,670
57,446
kWh
$120
36
kW-months/year
$490
83
MMBtu
$8,840
13,660
gal
$19,960
11,213
gal
$84,580
-
$
$54,560
-
$
TOTAL IMPLEMENTED Savings:
$5,330
Cost:
$6,200
$4,840 86,460 - - $490 83 - - - - - - - - $4,840
86,460
kWh
-
-
kW-months/year
$490
83
MMBtu
-
-
gal
-
-
gal
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ gal $ $ $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Other Liquid (haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Other Liquid (haz) Personnel Changes Ancillary Material Cost