IAC logo
IAC Assessment: TN0610
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0610
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1997
Principal Product circuit board mounted power supplies
NAICS n/a
SIC 3679 - Electronic Components, Nec
Sales $10,000,000-$50,000,000
# of Employees 276
Plant Area (Sq.Ft.) 33,000
Annual Production 1,144,000 Pieces
Production Hrs. Annual 4,862
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $66,941 1,881,887 kWh $0.04
Electricity Demand $25,447 4,239 kW-months/year $6.00
Electricity Fees $4,810 - $ -
LPG $9,991 785 MMBtu $12.73
TOTAL ENERGY COSTS $176,092
RECOMMENDED SAVINGS* $231,345 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand LPG Solid Waste (non-haz) Personnel Changes Primary Product Electricity Usage Electricity Demand LPG Solid Waste (non-haz) Personnel Changes Primary Product
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
01: 4.4210 MODIFY CURRENT INCENTIVE PROGRAM Savings:
$118,000
Cost:
$10,000
- - - - - - - - - - $118,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
$118,000
-
$
02: 4.4450 INSTALL EQUIPMENT TO MOVE PRODUCT Savings:
$56,055
Cost:
$50,060
- - - - - - - - $56,055 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$56,055
-
$
-
-
$
03: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$32,660
Cost:
$11,800
$(-100) (-2,052) - - - - $32,760 - - - - - $(-100)
(-2,052)
kWh
-
-
kW-months/year
-
-
MMBtu
$32,760
-
lb
-
-
$
-
-
$
04: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$15,220
Cost:
$3,600
$(-60) (-1,172) - - - - $17,360 - $(-2,080) - - - $(-60)
(-1,172)
kWh
-
-
kW-months/year
-
-
MMBtu
$17,360
-
lb
$(-2,080)
-
$
-
-
$
05: 2.6232 INSTALL SET-BACK TIMERS Savings:
$7,910
Cost:
$3,520
$5,970 165,885 - - $1,940 152 - - - - - - $5,970
165,885
kWh
-
-
kW-months/year
$1,940
152
MMBtu
-
-
lb
-
-
$
-
-
$
06: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$630
Cost:
$250
$340 9,379 $290 48 - - - - - - - - $340
9,379
kWh
$290
48
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$525
Cost:
$1,120
$305 8,499 $220 36 - - - - - - - - $305
8,499
kWh
$220
36
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$345
Cost:
$250
$200 5,569 $145 24 - - - - - - - - $200
5,569
kWh
$145
24
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$231,345
Cost:
$80,600
$6,655 186,108 $655 108 $1,940 152 $50,120 - $53,975 - $118,000 - $6,655
186,108
kWh
$655
108
kW-months/year
$1,940
152
MMBtu
$50,120
-
lb
$53,975
-
$
$118,000
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
Electricity Usage Electricity Demand LPG Solid Waste (non-haz) Personnel Changes Primary Product Electricity Usage Electricity Demand LPG Solid Waste (non-haz) Personnel Changes Primary Product