IAC Assessment: TN0619
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0619
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1997
Principal Product Seat belt fabric
NAICS n/a
SIC 2399 - Fabricated Textile Products, Nec
Sales $100,000,000-$500,000,000
# of Employees 480
Plant Area (Sq.Ft.) 219,000
Annual Production 300,000,000 Thousand Feet
Production Hrs. Annual 6,600
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $751,038 24,721,571 kWh $0.03
Electricity Demand $446,985 47,770 kW-months/year $9.36
Electricity Fees $9,572 - $ -
Natural Gas $597,293 181,727 MMBtu $3.29
TOTAL ENERGY COSTS $1,948,950
RECOMMENDED SAVINGS* $729,195 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Other Liquid (non-haz) Other Liquid (haz) Personnel Changes Administrative Changes Ancillary Material Cost Primary Product Increase in Production Electricity Usage Electricity Demand Water Disposal Other Liquid (non-haz) Other Liquid (haz) Personnel Changes Administrative Changes Ancillary Material Cost Primary Product Increase in Production
$ kWh $ kW-months/year $ Tgal $ gal $ gal $ $ $ $ $ $ $ $ $ %
01: 4.112 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL Savings:
$537,700
Cost:
$66,720
- - - - - - - - - - $(-102,300) - $(-20,000) - - - - - $660,000 - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
gal
-
-
gal
$(-102,300)
-
$
$(-20,000)
-
$
-
-
$
-
-
$
$660,000
-
%
02: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$124,950
Cost:
$40,400
- - - - - - - - - - $(-17,050) - $(-20,000) - - - $162,000 - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
gal
-
-
gal
$(-17,050)
-
$
$(-20,000)
-
$
-
-
$
$162,000
-
$
-
-
%
03: 3.3128 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS Savings:
$46,080
Cost:
$4,900
- - - - $23,040 - $4,320 - - - - - - - $18,720 - - - - - -
-
kWh
-
-
kW-months/year
$23,040
-
Tgal
$4,320
-
gal
-
-
gal
-
-
$
-
-
$
$18,720
-
$
-
-
$
-
-
%
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$8,620
Cost:
$2,090
$8,620 287,222 - - - - - - - - - - - - - - - - - - $8,620
287,222
kWh
-
-
kW-months/year
-
-
Tgal
-
-
gal
-
-
gal
-
-
$
-
-
$
-
-
$
-
-
$
-
-
%
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$4,850
Cost:
$4,350
$4,850 430,832 - - - - - - - - - - - - - - - - - - $4,850
430,832
kWh
-
-
kW-months/year
-
-
Tgal
-
-
gal
-
-
gal
-
-
$
-
-
$
-
-
$
-
-
$
-
-
%
06: 3.7212 IMPROVED MATERIAL HANDLING (MIXING AND TRANSFER) Savings:
$3,345
Cost:
-
- - - - - - - - $3,825 900 - - $(-1,000) - $520 - - - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
gal
$3,825
900
gal
-
-
$
$(-1,000)
-
$
$520
-
$
-
-
$
-
-
%
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,820
Cost:
$4,340
$1,760 58,617 $1,060 108 - - - - - - - - - - - - - - - - $1,760
58,617
kWh
$1,060
108
kW-months/year
-
-
Tgal
-
-
gal
-
-
gal
-
-
$
-
-
$
-
-
$
-
-
$
-
-
%
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$830
Cost:
$745
$240 7,913 $590 60 - - - - - - - - - - - - - - - - $240
7,913
kWh
$590
60
kW-months/year
-
-
Tgal
-
-
gal
-
-
gal
-
-
$
-
-
$
-
-
$
-
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$729,195
Cost:
$123,545
$15,470 784,584 $1,650 168 $23,040 - $4,320 - $3,825 900 $(-119,350) - $(-41,000) - $19,240 - $162,000 - $660,000 - $15,470
784,584
kWh
$1,650
168
kW-months/year
$23,040
-
Tgal
$4,320
-
gal
$3,825
900
gal
$(-119,350)
-
$
$(-41,000)
-
$
$19,240
-
$
$162,000
-
$
$660,000
-
%
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
gal
-
-
gal
-
-
$
-
-
$
-
-
$
-
-
$
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ gal $ gal $ $ $ $ $ $ $ $ $ %
Electricity Usage Electricity Demand Water Disposal Other Liquid (non-haz) Other Liquid (haz) Personnel Changes Administrative Changes Ancillary Material Cost Primary Product Increase in Production Electricity Usage Electricity Demand Water Disposal Other Liquid (non-haz) Other Liquid (haz) Personnel Changes Administrative Changes Ancillary Material Cost Primary Product Increase in Production